Q.

Can I install a reducing fitting at an explosionproof seal located just outside the boundary of a Class 1 Division I area?

A.

Yes, if it's a listed explosionproof reducer fitting. However, if the reducer is located after the seal, then the reducing fitting isn't required to be explosionproof listed [501.5(A)(4)] (Fig. 1).

Q. Is it permissible to wrap a stranded wire around the screw terminal of a receptacle?

A.

According to the UL White Book under the RTRT category, stranded wire is permitted to terminate to a screw terminal of a receptacle [110.3(B)].

Q.

Is it permissible to use a galvanized ground rod for a grounding electrode? If yes, must it be listed?

A.

You may use a galvanized ground of 8 feet in length and not less than 0.625 inches in diameter as an electrode. The rod isn't required to be listed [250.52(A)(5)(b)].

Q.

If I installed a listed breaker from one manufacturer in a listed panel from another manufacturer, does this void the panel listing?

A.

Depends on whom you ask. I'm sure equipment manufacturers only warranty their panelboards when used with their circuit breakers. However, UL certifies circuit breakers by independent manufacturers to be suitable for installation in different manufacturers' panelboards. This is an issue equipment manufacturers constantly battle, and it will be resolved by the AHJ [90.4 and 110.3(B)] or by a judge in the courtroom.

Q.

Our township requires a sprinkler system in electrical equipment rooms. The sprinkler system in our building is located 2 feet in front of and just above the main switchboard. Several sprinklers are located along this run, and no protection is provided to the switchboard in case of a leak or a sprinkler goes off. Is this a violation of the NEC?

A.

No. Section 110.26(F)(1)(c) permits sprinkler protection of electrical equipment as long as the piping isn't located above the switchboard.

Q.

I have a situation where our electrical engineer has designed something I believe may not be Code-compliant. He wants to supply three separate single-phase 480V transformers from a 3-phase breaker. The first transformer is connected to Line 1 and Line 2, the second to Line 2 and Line 3, and the third to Line 1 and Line 3. The overcurrent protection device for each of the transformers is sized in accordance with Table 450.3(B). Is it Code compliant to supply single-phase loads from a 3-phase breaker?

A.

Sure. A 3-phase breaker may supply three single-phase line-to-line loads, but no more than one conductor can be placed on the circuit breaker terminal, unless the terminal is identified for two conductors.

Q.

Can I plug a power-strip into another power-strip (daisy-chain)?

A.

No. According to the UL White Book (category XBYS), “Relocatable power taps are not intended to be series connected (daisy-chained) to other relocatable power taps or to extension cords.”

Q.

Can a 30kVA transformer be suspended above a suspended ceiling used for environmental air? If yes, does it need to be plenum-rated? The ceiling is accessible by removing any 2-foot by 4-foot ceiling tile, and the clearances around and above the transformer comply with code and manufacturer specifications.

A. Yes, as long as it's a dry-type transformer rated 600V, nominal, or less and doesn't exceed 50kVA [450.13(B)] (Fig. 2). If the transformer case is metal, it isn't required to be listed as having adequate fire-resistant or low-smoke-producing characteristics [300.22(C)].

Q.

Can a 277V circuit supply a wall-mounted compact fluorescent night light in a homeless shelter?

A.

Maybe, maybe not. According to 210.6(A) the maximum nominal voltage between conductors for luminaires in dwelling units and guest rooms of hotels, motels, and similar occupancies shall not exceed 120V. Because a room of a homeless shelter would be considered a “similar occupancy,” the maximum nominal circuit voltage for luminaires would be 120V. However, this only applies to the guest rooms of the homeless shelter, not the common area.

Q.

Can communications cable be installed within supply and return air ducts?

A.

Yes. Communications cables can be installed in ducts, plenums, and other spaces used for environmental air, as long as the cable is Type CMP [800.53(A)].

Correction: In the October 2003 Code Quandaries column, the answer to the following question included additional text that didn't apply. The question and answer should read as follows:

Q.

I think that a 120V outdoor receptacle for sump pump equipment in an industrial plant should be plugged into a GFCI receptacle for personnel safety. Is there an NEC article that addresses it directly or indirectly?

Also, are there any Code rules that require a receptacle for drinking fountains in commercial/industrial settings to be GFCI-protected?

A.

Sorry, but the NEC doesn't require GFCI protection for any of these applications.

Need some help with an installation? E-mail Mike at mike@mikeholt.com with a description of the situation and your question may show up in a future column.




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues