Bonding is extremely important anywhere in an electrical system, but there are some areas where regular bonding methods might not be sufficient. In areas like services, 277V or 480V circuits, and some hazardous (classified) locations, extra measures must be taken to ensure that the bonding connections will withstand the ground-fault conditions and prevent arcing from a ground fault. The term “assured bonding” is intended to help clarify the special care required to ensure a safe installation.

Assured bonding of service enclosures and raceways
A ground fault at service equipment, enclosures, or raceways that contain service conductors can cause tremendous destruction if not cleared quickly. Because of this danger, the NEC requires you to bond the following metal parts containing service conductors to an effective ground-fault current path in accordance with the assured bonding requirements contained in 250.92(B):

• Metal raceways that contain service conductors
• Enclosures, such as disconnects, meter enclosures, or wireways that contain service conductors
• Metal raceway that contains the grounding electrode conductor [250.64(E) and 250.102(C)]

Assured bonding doesn't apply to raceways or enclosures that contain feeder and
branch-circuit conductors.

Enclosures and raceways that contain service conductors must be assured bonded to an effective ground-fault current path by one of the following methods:

• Bond enclosures and raceways to the grounded (neutral) service conductor by exothermic welding, listed pressure connectors, listed clamps, or other listed fittings (250.8). An equipment-bonding conductor isn't required within rigid nonmetallic conduit that contains service conductors [250.142(A)(1) and 352.60 Ex. 2] because fault current uses the grounded (neutral) service conductor as the effective ground-fault current path to the power supply [250.24(B)].
• Raceways are considered suitably bonded when threaded couplings or threaded bosses are wrenched tight on enclosures.
• Raceways are considered suitably bonded that are connected with threadless raceway couplings and connectors that are made wrench tight.
• When a metal service raceway terminates to an enclosure with a ringed knockout, one end of the service raceway must be bonded with a bonding jumper sized in accordance with Table 250.66 [250.102(C)].
• When a metal service raceway terminates to an enclosure without a ringed knockout one end of the raceway must be bonded by a bonding jumper or a bonding-type locknut. Standard locknuts aren't suitable for this purpose. A bonding-type locknut differs from a standard-type locknut in that it has a bonding screw with a sharp point that drives into the metal enclosure. Assured bonding one end of a service raceway provides the low-impedance path for fault current to return to the utility power supply.



what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues