ECM Buyers' Guide
  

The Almighty Code

With its 50th edition about to hit the streets, the NEC has now seen more revisions than a lot of electrical industry professionals have celebrated birthdays, but it's no less revered or relevant than when it was first published more than 100 years ago. From its humble beginnings in 1897, to becoming the go-to guide for safe electrical installations, the Code has taken on a “higher” significance and developed an almost religious following. Electrical designers, construction personnel, maintenance technicians, and electrical inspectors track its every move and study its nuances ad infinitum. It's as if this material object has some type of attractive power that draws people in and converts them into lifelong acolytes.

And if you need proof, just look around at your colleagues. EC&M readers are as committed as anyone in the industry. I see this each and every time I review the independent reader research data supplied to me by our marketing department. For instance, take a look at some key statistics from our recent research reports.

  • 73% read the August and September Code Quandaries department

  • 72% read the July Code Basics article, “Don't Get Your Signals Crossed When Installing Radio and TV Equipment”

  • 78% subscribe to CodeWatch, EC&M's e-newsletter on the Code

  • 74% read the June Code Violations article, “What's Wrong Here?”

  • 80% read the April Code Quandaries department

  • 4.8 out of 5.0 was the importance rating assigned to the Code by EC&M readers

But it's more than just the numbers. When we asked you what you want to see discussed in the magazine in greater detail, these were just a few of the many Code-related suggestions you gave us:

  • “Code issues involving UPSs and gen-sets”

  • “Electrical design and how the NEC applies”

  • “Expanded viewpoints of NEC code selections”

  • “NEC changes for present Code throughout the three-year cycle, as well as up-and-coming Code changes slated for the new Code series”

So as not to disappoint you or keep you from work as a Code disciple, this month's cover story, written by NEC consultant Mike Holt, presents the Top 25 need-to-know revisions of the 2005 NEC (page 44). From added requirements for GFCIs and revised rules for AFCIs to clarified definitions and intent of grounding and bonding requirements, we've got you covered.

In an industry where safety requirements constantly evolve, the measure of its standards is how well they adapt to members' needs. And the true measure of its members is how well they educate themselves on those evolving standards. If you don't choose to get your Code change information from EC&M, get it somewhere. We need as many informed — and safe — installers who worship in the church of the Code as we can get.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues