ECM Buyers' Guide
  

Code Quiz

Q. The wiring of each mobile home shall be subjected to a ____ minute, ____ volt dielectric strength test (with all switches closed) between live parts (including neutral) and the mobile home ground. Alternatively, the test shall be permitted to be performed at ___ volts for ___ second(s). This test shall be performed after branch circuits, luminaires (fixtures), and appliances are installed.

A) 10, 240 and 550, 10
B) 5, 480 and 600, 2
C) 1, 900 and 1,080, 1
D) There are no required tests for mobile homes, RVs, or any type of structure.

Answer: C
Testing requirements of this type are unique to mobile homes and are noted in sections 550.17(A), 551.60, and 552.60(A) of the 2005 NEC.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Emergency lighting controls

Feb 9, 2012 8:40 AM

Emergency lighting controls

The UL924 emergency lighting control relay (ERC) mounts in the ceiling and features an automatic diagnostic feature ...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues