Code Quiz

Nov 7, 2005 4:09 PM, By Steven Owen

Q. What is the minimum cable tray width required for an installation that consists of six sets of 1,000 kcmil conductors (rated 600V) bundled in six sets of three-each conductors in an uncovered ladder type tray? The bundles are configured in the form of a triangle – two side-by-side on the bottom with the third sitting on top of the two. The cable tray is not listed for grounding and will not be used as the equipment grounding conductor. As such, there are a total of 19 conductors in the tray. The outer diameter of all 19 conductors is 1.44 inches. Do you know the proper name of this 19th conductor?

A) 17.28 inches minimum / equipment bonding conductor

B) 18.72 inches minimum / equipment grounding conductor

C) 25.92 inches minimum / grounded conductor

D) 27.36 inches minimum / grounding electrode conductor

Answer: B

Explanation: Per a change in the 2005 NEC, 392.10(A)(1) was revised for single conductors (1,000 kcmil and larger) installed in cable trays. Where all of the cables are 1,000 kcmil or larger, the sum of the diameters of all single conductor cables shall not exceed the cable tray width, and the cables shall be installed in a single layer. It is permitted to install conductors that are bound together to comprise a circuit group in other than a single layer.

Therefore, the solution to this problem is as follows: Six bundled groups of three conductors, plus one equipment grounding conductor make a total of nineteen conductors. The bundling arrangement for these conductors ― installed in parallel, as a single feeder ― leaves us with a total of 12 conductors on the bottom row. Add to this the equipment grounding conductor and you end up with a grand total of 13 conductors on the bottom row of the tray.

13 X 1.44 = 18.72 inches, minimum.

Note that you do not need to account for the six conductors that are stacked (i.e., bundled) on top of the six sets of two conductors on the bottom row when making your final calculations.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Want to use this article? Click here for options!



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

LED light engine

November 2, 2009

LED light engine

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues