Q. When installing a grid structure at a dwelling unit swimming pool, the equipotential bonding grid shall cover the contour of the pool and the pool deck.

The grid shall extend _____ inches horizontally from the inside walls of the pool. The grid shall be arranged in a network that is _____ inches by _____ inches, and shall be uniformly spaced in a perpendicular grid pattern with a tolerance of _____ inches.

A) 36 / 12 by 12 / 4
B) 30 / 12 by 12 / 6
C) 30 / 24 by 24 / 6
D) 36 / 16 by 16 / 8

Answer: A

Explanation: The NFPA substantially revised Section 680.26(C), Equipotential Bonding Grid, of the 2005 edition of the NEC. This section now requires you to install an equipotential plane (ground grid), extending out 36 inches in all directions from the inside edge of the pool. The grid shall be arranged in a network of conductors (12 inches by 12 inches) that is uniformly spaced in a perpendicular grid pattern with a tolerance of 4 inches. At all crossing points of the grid, the grounding grid conductor connections shall be made as required by 680.26(D).

The requirements of this section of the Code are similar to the requirements for grounding and bonding equipotential plane(s) as noted in 682.33 for natural and artificially made bodies of water.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues