ECM Buyers' Guide

Code Quiz


Code Quiz 

Nov 27, 2006, By Steven Owen

In a Class 1 location of a spray application (Art. 516) area, portable equipment such as portable electric lamps or other utilization equipment shall be permitted in which of the following situations?...

Code Quiz 

Nov 13, 2006, By Steven Owen

The wiring of the emergency system in hospitals shall be mechanically protected. Where installed as branch circuits in patient care areas, the installation shall comply with the requirements of 517.13(A) and 517.13(B). Which of the following wiring methods is permitted?...

Code Quiz 

Oct 25, 2006, By Steven Owen

What is the proper size overload, and branch-circuit, short-circuit, ground-fault protective device permitted for a hermetic compressor with a nameplate rated-load of 38A, and a branch-circuit selection current of 40A?...

Code Quiz 

Oct 11, 2006, By Steven Owen

What is the proper size branch-circuit, short-circuit, ground-fault protective device required for a hermetic compressor with a nameplate rated load of 38A?...

Code Quiz 

Sep 25, 2006, By Steven Owen

What is the minimum size XHHW insulated feeder conductor permitted for an industrial machine, which consists of the following loads? All terminals are rated at 75°C....

Code Quiz 

Sep 8, 2006, By Steven Owen

What is the maximum allowable ampacity of 12 AWG THHN insulated conductors installed in a strut-type channel raceway that is 1½ inches by 1½ inches?...

Code Quiz 

Aug 28, 2006, By Steven Owen

When installing a new service for a separate building constructed on the top floor of a parking garage, it has been determined that the service conductors will have to be installed in rigid metal conduit (RMC) starting in the vault below grade of the first floor level of the parking garage...

Code Quiz 

Aug 14, 2006, By Steven Owen

What is the maximum number of 12 AWG THHN insulated conductors permitted in a strut-type channel raceway that is 1½ inches by 1½ inches and of unlimited length?...

Code Quiz 

Jul 25, 2006, By Steven Owen

What is the minimum size NM cable required for an electric space-heating branch circuit installed 3 inches above a heated ceiling (with no thermal insulation) in a dwelling unit?...

Code Quiz 

Jul 11, 2006, By Steven Owen

When installing electric heat-tracing cables and heating panels in industrial installations (where ground fault alarm indication is provided and the operation cannot tolerate a ground fault condition that would normally open the circuit overcurrent device)...

Code Quiz 

Jun 20, 2006, By Steven Owen

What is the minimum acceptable voltage at a fire pump motor’s terminals, when the 460V-rated motor is supplied with an operating voltage of 480V, and the motor is operating at 115% of the full-load current rating of the motor?...

Code Quiz 

Jun 12, 2006, By Steven Owen

When installing wiring from a fire pump controller to a fire pump motor, which of the following wiring methods is not permitted?...

Code Quiz 

May 24, 2006, By Steven Owen

An existing corporate data center is concerned about possible loss of power due to the fact that it is supplied by only one service. The existing feed consists of a 1600A, 208Y/120V, 3-phase, four-wire service. Data center management personnel propose to add an additional service....

Code Quiz 

May 11, 2006, By Steven Owen

According to 110.16, certain information is required on the label when marking switchboards, panelboards, industrial control panels, meter socket enclosures, and motor control centers....

Code Quiz 

Apr 24, 2006, By Steven Owen

Excluding exceptions, what is the requirement for cabling work space, which includes a requirement for a clear work space not less than...

Code Quiz 

Apr 11, 2006, By Steven Owen

What is the minimum number of 20A branch circuits required for a guest suite of a hotel or motel, which consists of the following...

Code Quiz 

Mar 26, 2006, By Steven Owen

Disregarding the Exceptions in 225.32, when are you not required to install a disconnecting means for a building or structure at the building or structure?...

Code Quiz Correction 

Mar 12, 2006, By Steven Owen

The answer to the question below, shown in the March 13 issue of CodeWatch, was incorrectly shown as: A) fire alarm systems. In retrospect, I should have added a fifth option, which read as follows: E) none of the above. This would be the correct answer in this case....

Code Quiz 

Feb 26, 2006, By Steven Owen

With respect to a solar photovoltaic system, a disconnecting means is required to disconnect all current-carrying conductors of a photovoltaic power source from all other conductors in a building or other structure. A switch or circuit breaker shall not be installed in a grounded conductor unless...

Code Quiz 

Feb 11, 2006, By Steven Owen

What is the maximum number of overcurrent devices permitted in a lighting and appliance branch-circuit panelboard? What is the maximum number of overcurrent devices permitted in a power distribution unit (PDU) of an information technology system?...

Code Quiz 

Jan 25, 2006, By Steven Owen

When installing a grid structure at a dwelling unit swimming pool, the equipotential bonding grid shall cover the contour of the pool and the pool deck...

Code Quiz 

Jan 10, 2006, By Steven Owen

An equipotential plane installed at a catfish farm pond is required for the service equipment installed outdoors (adjacent to the pond), where the service equipment controls equipment is installed in and adjacent to the water....

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | Next

what's wrong here?

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues