ECM Buyers' Guide

Code Quiz


Code Quiz 

Apr 17, 2008, By Steven Owen

What is the minimum cubic inch area required for a terminal housing supplied with a generator?...

Code Quiz 

Apr 3, 2008, By Steven Owen

When installing wiring methods in ducts or plenums used for environmental air, all but which of the following wiring methods are permitted?...

Code Quiz 

Mar 20, 2008, By Steven Owen

Which of the following methods for connecting grounding and bonding conductors to equipment is the only one not permitted by the NEC?...

Code Quiz 

Mar 6, 2008, By Steven Owen

What is the allowable ampacity of any one of the current-carrying 12 AWG THHN insulated conductors installed in a cellular concrete floor raceway with 29 other current-carrying 12 AWG THHN conductors and five equipment grounding conductors?...

Code Quiz 

Feb 21, 2008, By Steven Owen

On a 3-phase, 4-wire, 277V multi-wire lighting circuit, which is protected at 20A, there is debate as to the proper application of 210.4(B) and 240.15(B)....

Code Quiz 

Feb 7, 2008, By Steven Owen

On a 3-phase, 4-wire, 480/277V service, a question has arisen as to the required rating of the service disconnect. The calculated load is 780A. The fusible disconnecting means is rated at 1,000A, based on the maximum fuse size that can be installed....

Code Quiz 

Jan 24, 2008, By Steven Owen

In accordance with the 2008 NEC, excluding exceptions, arc-fault circuit-interrupter protection is required in which of the following dwelling unit locations?...

Code Quiz 

Jan 10, 2008, By Steven Owen

Excluding exceptions, which one of the following locations does not require GFCI protection for 15A and 20A, 125V single-phase receptacles?...

Code Quiz 

Dec 27, 2007, By Steven Owen

For a 20A, 125V, single-phase receptacle that supplies power to a cord-and-plug connected metering pump, which is integral to a continuous industrial process that cannot tolerate an unexpected loss of power, installed outdoors in an industrial facility, the 20A receptacle...

Code Quiz 

Dec 13, 2007, By Steven Owen

In a large electrical room with numerous pieces of equipment rated at 1,200A or more, the question has arisen as to whether panic hardware is or is not required on all of the personnel doors....

Code Quiz 

Nov 27, 2007, By Steven Owen

What is the maximum allowable ampacity of a 10 AWG THHN or THWN-2 insulated conductor installed in a schedule 80 PVC raceway (90°C rated) installed underground from the branch-circuit panelboard to the luminaires installed for parking lot lighting?...

Code Quiz 

Nov 13, 2007, By Steven Owen

When installing cable- or raceway-type wiring methods, installed in exposed or concealed locations under metal-corrugated sheet roof decking, the cable- or raceway-type wiring method shall be installed and supported so that the nearest outside surface of the cable or raceway is not less than 1½ inches from the nearest surface of the roof decking...

Code Quiz 

Oct 26, 2007, By Steven Owen

A new service consisting of 6 individual disconnect switches has been installed outdoors, on the back side of a small retail shopping center...

Code Quiz 

Oct 12, 2007, By Steven Owen

A cable tray system has been installed to support service entrance conductors. The service entrance conductors consist of six sets of three-conductor 500kcmil interlocked armored cables installed in parallel in a single layer in the tray. ...

Code Quiz 

Sep 27, 2007, By Steven Owen

A 60-foot metal pole supporting luminaires is found to be deficient with respect to the 2005 version of the NEC. The installation consists of the following...

Code Quiz 

Sep 13, 2007, By Steven Owen

According to the 2005 NEC (not any specific state or local code), when installing 2-foot by 4-foot fluorescent lay-in luminaires in suspended ceilings, how many corners of any one of the luminaires require an independent support wire to support it?...

Code Quiz 

Aug 27, 2007, By Steven Owen

A construction site has 10 office trailers. Each unit is identical. The HVAC unit for each trailer has a motor-rated load current of 27A and a branch circuit selection current of 30A at 208VAC, 3-phase. What is the proper size for the ground-fault, short-circuit protective device for each HVAC unit?...

Code Quiz 

Aug 13, 2007, By Steven Owen

What is the load on the service for 10 office trailers on a construction site? ...

Code Quiz 

Jul 27, 2007, By Steven Owen

Disregarding exceptions, which enclosure is limited to 30-foot (maximum) extensions beyond the equipment it supplements?...

Code Quiz 

Jul 13, 2007, By Steven Owen

When installing metal-armored cables and metal raceways, is it permissible to connect a metal-armored cable or a metal raceway to a nonmetallic box?...

Code Quiz 

Jun 27, 2007, By Steven Owen

When installing a high-impedance grounded neutral system, for a 480V, 3-phase system, the following question has arisen. Which of the following choices best describes the proper routing for the grounded conductor of the system?...

Code Quiz 

Jun 13, 2007, By Steven Owen

When installing a high-impedance grounded neutral system for a 480V, 3-phase electrical system, the following question arises. Where is the proper location for the grounding impedance (resistor)?...

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | Next

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues