Choose the best answer:

1. Which of the following methods provides acceptable mechanical protection against abrasion of Type NM cable when you run it through pre-cut rectangular holes in metal studs?

a. “Vee” grommets covering the bottom of the hole where the cable rests.

b. Factory knurled edges providing a smooth bearing surface

c. Grommets covering the entire perimeter of the opening

d. More than one of the above

2. Which of the following conductors (placed in rigid nonmetallic conduit in a 23-in.-deep trench) requires a warning ribbon placed above them?

a. Service entrance conductors

b. Service lateral conductors

c. Medium-voltage feeders (23kV), placed under a 4-in.-thick poured concrete sidewalk

d. Two of the above

e. All of the above

3. What special requirements apply when you wire in the cavity space of a fire-rated roof/ceiling assembly, and come down a support wire to a fluorescent fixture using a cabled wiring method?

a. Don’t attach to a support wire.

b. Don’t use a wire that’s part of the minimum ceiling design.

c. Only use a support wire recognized for this purpose in the tested ceiling design.

d. Two of the above

4.. If the cavity space in the preceding question isn’t part of a fire-rated design, how does that affect the answer? Use the same answer set as the preceding question.

5. Which of the following responses correctly shows the minimum strip length for the end of a run of Type UF cable entering the boxes as given? Assume you’ll position the trimmed sheath to just clear the clamp.

a. 7 in., interior cable clamp, back edge of 3½-in. device box recessed in drywall

b. 10 in., exterior cable clamp in KO 1 in. from the rear wall of a 1021028-in.-deep junction box

c. 6 in., rear of 4-in.-sq outlet box (1½-in. deep) with a ½-in.-rise square-to-round plaster ring

d. Two of the above

e. All of the above

6. Which of the following wiring methods could you use to run a 500 kcmil 13.8 kV feeder through an open basement joist cavity? Although only employees have access to this area, not all of them have electrical training.
a. Cable bus
b. Busway
c. Type MC cable
d. EMT
e. Two of the above
f. Three of the above
g. All of the above


Answers and Discussion


1. c, Sec. 300-4(b)(1). You need to use a grommet; knurled edges aren’t mentioned in the rule. The grommet you use needs to cover the entire perimeter of the opening, so if the cable hangs up during pulling, a cable loop doesn’t end up skinned on one side as it moves across the top of the opening.

2. d, Sec. 300-5(d), Table 300-50 Ex. 3. However unintended, service entrance conductors aren’t covered in this rule, only service lateral conductors. The medium-voltage rule warns you of situations including the following: suppose you dug up that sidewalk. You wouldn’t otherwise know it had an additional function to protect medium-voltage conductors.

3. b, Sec. 300-11(a)(1). Leave the original design alone. Developing and testing these designs is incredibly expensive, and the idea that someone might rerun the tests just to encompass branch circuit wiring on particular ceiling elements, as covered in the Exception, just won’t happen. Instead, add additional wires as required. Then, so the inspector knows you didn’t mess with the original design, be sure to color code or tag the extra wires you’re using.

4. b, Sec. 300-11(a) and -11(a)(2). Same answer, different reason. Again, add extra wires instead of messing with the ceiling design. However, you don’t have to identify the wires, since exact placement isn’t so critical. The Exception isn’t a factor, since ceiling designs aren’t likely to anticipate specific branch circuit wiring patterns.

5. d, Sec. 300-14. You need 6 in. minimum, and 3 full in. to extend outside the box opening. You’d need about 7 in. for the device box, but just 6 in. for the 4-in.-sq application. The junction box represents a special case, since you can get both hands into it to work (8 in.28 in. min.). Now, the wire need only meet the traditional 6-in. min.

6. g, Sec. 300-37. You’ll find all the methods mentioned in this section to be acceptable, which is the 1999 NEC relocation of former Sec. 710-4(a). In making the change, the Code added EMT to the list.

Find More Code Quizzes »


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues