May 1, 2000 12:00 PM, By James Stallcup, Jr., NEC and OSHA Consultant

Choose the best answer:

1. A transformer is installed and used as a separately derived AC system. At what point on the system should you connect the grounding electrode conductor?

(a) At the service panel

(b) At the overcurrent device on the supply side

(c) At any point on the load side of the first disconnecting means

(d) At any point on the separately derived system from the transformer to the first disconnecting means or overcurrent device


2. Where a separately derived AC system is located on the third floor of a shopping mall, your preferred or first choice for a grounding electrode is:

(a) A metal gas pipe

(b) A concrete-encased electrode

(c) A driven ground rod at the first floor of the building

(d) The nearest available effectively grounded structural member of the building


3. The metal water piping system in the area served by a separately derived AC system is not effectively grounded, so a ground rod is used as the grounding electrode. What must you do with the metal water piping in the area?

(a) Bond it to a separate ground rod.

(b) Bond it to the grounded conductor of the separately derived system.

(c) Use it as a supplemental grounding electrode for the separately derived system.

(d) Isolate it from any contact with the electrical system, since it's not effectively grounded.


4. If a separately derived AC system is installed in an industrial building where the conditions of maintenance and supervision ensure that only qualified persons will service the installation, then:

(a) The resistance of a single-made electrode may exceed 25 ohms.

(b) An exposed metal water pipe is permitted to serve as a grounding electrode.

(c) A metal underground gas piping system is permitted to serve as a grounding electrode.

(d) Building steel that is not effectively grounded is permitted to serve as a grounding electrode.

Answers and Discussion

1. (d). The grounding electrode conductor is sized in accordance with Sec. 250-66 (based on the derived phase conductors supplying the panel, switch, or other equipment connected to the secondary of the transformer) and connected at any point on the separately derived system from the source to the first disconnecting means or overcurrent protection device per Sec. 250-30(a)(2).

2. (d). The grounding electrode conductor shall be located as near as possible and preferably in the same area as the grounding electrode conductor connection to the system. Your first choice should be to connect to the nearest structural steel member of the building structure per Sec. 250-30(3)(a).

3. (b). An ungrounded metal water piping system, located in the vicinity of a separately derived system, which uses a grounding electrode, must be bonded to the derived system's grounded conductor. Regardless of whether the water piping system is supplied by nonmetallic piping to the building or structure, proper bonding of the interior metal water piping system is required. Stallcup's Code Loop: Sec. 250-30(a)(3)(c) and FPN 250-104(a)(4).

4. (b). An exception to Sec. 250-30(a)(3)(b) permits you to use an exposed metal water piping system as a grounding electrode for the separately derived system, as long as the entire length of the interior metal water pipe is exposed.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues