Aug 1, 2000 12:00 PM, By James Stallcup, Jr., NEC and OSHA Consultant

Choose the best answer:

1. What is the full-load current (FLC) rating of a 50 hp, 460V, 3-phase, Design B, squirrel-cage induction motor (motor nameplate FLA is 61.5A)?

(a) 60A
(b) 65A
(c) 68A
(d) 70A

2. What is the locked-rotor current (LRC) rating of a 50 hp, 460V, 3-phase, Design B, squirrel-cage induction motor?

(a) 363A
(b) 385A
(c) 400A
(d) 515A

3. What size time delay fuse (TDF) is required to start and protect a 50 hp, 460V, 3-phase, Design B, squirrel-cage induction motor per the following?

Part 1. Size the minimum (round down) TDF per Table 430-152.

(a) 110A
(b) 125A
(c) 150A
(d) 175A

Part 2. Size the next (round up) TDF per Sec. 430-52(c)(1), Ex. 1.

(a) 110A
(b) 125A
(c) 150A
(d) 175A

Part 3. Size the maximum TDF per Sec. 430-52(c)(1), Ex. 2(b).

(a) 110A
(b) 125A
(c) 150A
(d) 175A

Part 4. Start the motor with the smallest TDF per Table 430-151.

(a) 80A
(b) 90A
(c) 100A
(d) 110A

Answers and Discussion

1. (b). Except for sizing the overload protection, Sec. 430-6(a)(1) requires the FLC in amps from Table 430-150 to be used for sizing the elements of a motor circuit.

Stallcup’s Code Loop: Sec. 430-6(a)(1) and Table 430-150.

2. (a). Sec. 430-7(a)(9) mentions the Design letters of motors as B, C, D, or E. Refer to Table 430-151 for the LRC in amps to be used as starting currents of motors.

3. Part 1. (a). Use Table 430-152 and Sec. 430-52(c)(1) to select the minimum size TDF rating. However, you can use any size TDF that will start and run the motor.

Step 1: First, find the FLA per Sec. 430-6(a)(1) and Table 430-150.

50 hp = 65A

Step 2: Then, find the proper percentage per Sec. 430-52(c)(1) and Table 430-152.

Minimum size = 175%

Step 3: Then, calculate the minimum size per Sec. 430-52(c)(1).

65A x 175% = 113.75A

Step 4: Now, select the proper size TDF per Sec. 240-6(a).

Solution: The minimum size time delay fuse is 110A.

Stallcup’s Code Loop: Sec. 430-6(a)(1), Table 430-150, Sec. 430-52(c)(1), Table 430-152, and Sec. 240-6(a).

Part 2. (b). Sec. 430-52(c)(1), Ex. 1 allows the next size TDF to be used above 113.75A (round up), which is 125A. Note: The round up method is the size most often used.

Part 3. (b). Table 430-152 and Sec. 430-52(c)(1), Ex. 2(b) are used to select the maximum size TDF rating. However, you can use any size TDF that will start and run the motor.

Step 1: First, find the FLA per Sec. 430-6(a)(1) and Table 430-150.

50 hp = 65A

Step 2: Then, find the proper percentage per Sec. 430-52(c)(1), Ex. 2(b) and Table 430-152.

Maximum size = 225%

Step 3: Then, calculate the maximum size per Sec. 430-52(c)(1).

65A x 225% = 146.25A

Step 4: Now, select the proper size TDF per Sec. 240-6(a).

Solution: The maximum size time delay fuse is 125A.

Stallcup’s Code Loop: Sec. 430-6(a)(1), Table 430-150, Sec. 430-52(c)(1), Ex. 2(b), Table 430-152, and Sec. 240-6(a).

Part 4. (a). Based on the answer in question (2), we know the LRC rating of this motor is 363A. We also know a TDF will normally hold five times its rating. Since 80A x 5 = 400A is greater than 363A, an 80A TDF will typically allow a motor with an LRC of 363A to start and run. (See Secs. 430-57, Ex. and 430-55.)

Note: Minimum and maximum sizes are used as a starting point to select the OCPD (smaller sizes can be selected).

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues