Oct 1, 2000 12:00 PM, By James Stallcup

Grounding - Art. 250

Choose the best answer:

1. What size copper grounded (neutral) conductor does the National Electrical Code (NEC) require if the service-entrance conductors are rated at No. 250kcmil THWN copper?

(a) No. 6

(b) No. 4

(c) No. 2

(d) No. 1/0

2. What size copper main bonding jumper does the NEC require if the service-entrance conductors are rated at No. 250kcmil THWN copper?

(a) No. 4

(b) No. 2

(c) No. 1/0

(d) No. 2/0

3. What size copper equipment-bonding jumper does the NEC require if the service-entrance conductors are rated at No. 250kcmil THWN copper?

(a) No. 2

(b) No. 1/0

(c) No. 2/0

(d) No. 3/0

4. What size copper grounding electrode conductor does the NEC require to ground a service to a metal water pipe supplied by No. 250kcmil THWN copper conductors?

(a) No. 8

(b) No. 6

(c) No. 4

(d) No. 2

5. What size copper grounding electrode conductor does the NEC require to supplement the metal water pipe in Question 4 to a driven rod?

(a) No. 8

(b) No. 6

(c) No. 4

(d) No. 2

answers and discussion

1. (c). The grounded (neutral) conductor must be routed with the ungrounded (phase) conductors and shall not be smaller than the required grounding electrode conductor (GEC), per Table 250-66. However, it's not required to be larger than the largest ungrounded service-entrance (phase) conductor. Note: The grounded (neutral) conductor must also comply with Secs. 220-22 and 310-15(b)(4)(c).

Step 1: Find the appropriate grounded (neutral) conductor, per Table 250-66.

Solution: No. 250kcmil Cu requires No. 2 Cu.

Stallcup's Code Loop: Secs. 250-24(b)(1), and 250-142(a)(1), and Table 250-66.

2. (b). The size of the service main bonding jumper (MBJ) is based on the size of the service-entrance conductors. You size it, per Table 250-66.

Step 1: Find the MBJ, per Table 250-66.

Solution: No. 250kcmil Cu requires No. 2 Cu.

Stallcup's Code Loop: Sec. 250-28(d) and Table 250-66.

3. (a). The size of the equipment-bonding jumper (EBJ) on the supply side of the service is based on the size of the service-entrance conductors. You size it, per Table 250-66.

Step 1: Size EBJ on supply side, per Table 250-66.

Solution: No. 250kcmil Cu requires No. 2 Cu.

Stallcup's Code Loop: Sec. 250-102(c) and Table 250-66.

4. (d). The procedure for selecting the proper size GEC to ground the service to a metal water pipe is determined based on the size of the service-entrance conductors. Note: There is no OCPD ahead of these conductors.

Step 1: Size the GEC, per Table 250-66.

Solution: No. 250kcmil Cu requires No. 2 Cu.

Stallcup's Code Loop: Secs. 250-66, 250-104(a), 250-50, and 250-50(a), and Table 250-66.

5. (b). You may install the copper tubing or metal water pipe in a new installation in the earth or above grade. Either installation requires an additional electrode to supplement the copper or metal water pipe. This additional grounding electrode must conform with Sec. 250-50(b) through (d) or Sec. 250-52(a) through (c).

Step 1: Size the GEC, per Sec. 250-66(a).

Solution: No. 250kcmil Cu requires No. 6 Cu.

Stallcup's Code Loop: Secs. 250-50(a)(2) and 250-66(a).

Next month's "Quizzes on the Code" will contain questions on sizing the grounded (neutral) conductor, main bonding jumper, and equipment-bonding jumper for a paralleled installation.

Each quiz on the 1999 National Electrical Code is provided with Stallcup's Code Loops to show the direct correlation with other sections of the NEC. This allows the reader to review other sections of the NEC when determining if the correct answer to a problem is in one or multiple sections of the Code.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues