Quizzes on the Code
Grounding - Art. 250
Choose the best answer:
1. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN
copper conductors per phase, what size grounded (neutral) conductor
does the NEC require in each run?
(a) No. 6 (b) No. 4 (c) No. 2 (d) No. 1/0
2. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size main jumper does the NEC require to ground the bus bar to the service equipment enclosure?
(a) No. 1/0 (b) No. 4/0 (c) 250kcmil (d) 300kcmil
3. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size individual equipment-bonding jumper does the NEC require to bond each service raceway?
(a) No. 1/0 (b) No. 2/0 (c) No. 3/0 (d) No. 4/0
4. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size equipment-bonding jumper does the NEC require to bond all service raceways?
(a) No. 4/0 (b) 250kcmil (c) 300kcmil (d) 500kcmil
Answers and Discussion
1. (d). You size the grounded conductor no smaller than 12.5% of the area of the largest service-entrance (phase) conductors larger than 1100kcmil copper or 1750kcmil aluminum. Base the grounded conductor on the total circular mil area of the service-entrance conductors, when installed in parallel. When you install grounded conductors in two or more raceways, size them based on the size of the ungrounded service-entrance conductors, but not smaller than No. 1/0.
Step 1: Calculate total circular mil area of service entrance conductors.
700kcmil x 3 = 2100kcmil
Step 2: Calculate minimum size grounded conductor, per Sec. 250-24(b)(2).
2100kcmil x .125 = 262.5kcmil
Step 3: Calculate proper size conductor for each conduit run.
262.5kcmil/3 = 87.5kcmil
Step 4: Select proper size grounded conductor for each conduit run, based on Table 8 in Ch. 9.
87,500 CM requires a No. 1/0 Cu conductor.
Stallcup's Code Loop: Secs. 250-24(b)(1), 250-24(b)(2), 310-4, and Table 8, Ch. 9.
2. (d). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the main bonding jumper (MBJ) to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.
Step 1: Calculate total circular mil area of service entrance conductors.
700kcmil x 3 = 2100kcmil
Step 2: Calculate minimum size MBJ, per Sec. 250-28(b).
2100kcmil x .125 = 262.5kcmil
Step 3: Select proper size MBJ, per Table 8, Ch. 9.
262.5kcmil requires a 300kcmil conductor.
Stallcup's Code Loop: Sec. 250-28(d) and Table 8, Ch. 9.
3. (b). If the ungrounded service-entrance conductors aren't larger than 1100kcmil copper or 1750kcmil aluminum, size the equipment-bonding jumper (EBJ) on the supply side of the service, per Table 250-66.
Step 1: Select proper size EBJ on the supply side of the service, per Table 250-66.
700kcmil Cu requires a No. 2/0 Cu conductor.
Stallcup's Code Loop: Sec. 250-102(c) and Table 250-66.
4. (c). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the EBJ to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.
Step 1: Calculate total circular mil area of service entrance conductors.
700kcmil x 3 = 2100kcmil
Step 2: Calculate minimum size EBJ, per Sec. 250-102(c).
2100kcmil x .125 = 262.5kcmil
Step 3: Select proper size EBJ, per Table 8, Ch. 9.
262.5kcmil requires a 300kcmil Cu conductor.
Stallcup's Code Loop: Sec. 250-102(c) and Table 8, Ch. 9.
Next month's "Quizzes on the Code" will contain questions on sizing the bonding jumper and grounding electrode conductor for a separately derived system.
Want to use this article? Click here for options!
© 2012 Penton Business Media, Inc.
Latest Articles
Labeling tool
Feb 10, 2012 7:58 AM
Emergency lighting controls
Feb 9, 2012 8:40 AM
Cupertino Electric Sponsors Construction Industry Academic Competition
Feb 8, 2012 4:14 PM
Trending Articles
Acceptable Use Policy blog comments powered by Disqus
advertisement
product spotlight
Labeling tool
Feb 10, 2012 7:58 AM
The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...
View all 2012 Product Spotlights
Free Product Info
Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.