Choose the best answer:
1. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size grounded (neutral) conductor does the NEC require in each run?

(a) No. 6 (b) No. 4 (c) No. 2 (d) No. 1/0

2. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size main jumper does the NEC require to ground the bus bar to the service equipment enclosure?

(a) No. 1/0 (b) No. 4/0 (c) 250kcmil (d) 300kcmil

3. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size individual equipment-bonding jumper does the NEC require to bond each service raceway?

(a) No. 1/0 (b) No. 2/0 (c) No. 3/0 (d) No. 4/0

4. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size equipment-bonding jumper does the NEC require to bond all service raceways?

(a) No. 4/0 (b) 250kcmil (c) 300kcmil (d) 500kcmil

Answers and Discussion

1. (d). You size the grounded conductor no smaller than 12.5% of the area of the largest service-entrance (phase) conductors larger than 1100kcmil copper or 1750kcmil aluminum. Base the grounded conductor on the total circular mil area of the service-entrance conductors, when installed in parallel. When you install grounded conductors in two or more raceways, size them based on the size of the ungrounded service-entrance conductors, but not smaller than No. 1/0.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size grounded conductor, per Sec. 250-24(b)(2).

2100kcmil x .125 = 262.5kcmil

Step 3: Calculate proper size conductor for each conduit run.

262.5kcmil/3 = 87.5kcmil

Step 4: Select proper size grounded conductor for each conduit run, based on Table 8 in Ch. 9.

87,500 CM requires a No. 1/0 Cu conductor.

Stallcup's Code Loop: Secs. 250-24(b)(1), 250-24(b)(2), 310-4, and Table 8, Ch. 9.

2. (d). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the main bonding jumper (MBJ) to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size MBJ, per Sec. 250-28(b).

2100kcmil x .125 = 262.5kcmil

Step 3: Select proper size MBJ, per Table 8, Ch. 9.

262.5kcmil requires a 300kcmil conductor.

Stallcup's Code Loop: Sec. 250-28(d) and Table 8, Ch. 9.

3. (b). If the ungrounded service-entrance conductors aren't larger than 1100kcmil copper or 1750kcmil aluminum, size the equipment-bonding jumper (EBJ) on the supply side of the service, per Table 250-66.

Step 1: Select proper size EBJ on the supply side of the service, per Table 250-66.

700kcmil Cu requires a No. 2/0 Cu conductor.

Stallcup's Code Loop: Sec. 250-102(c) and Table 250-66.

4. (c). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the EBJ to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size EBJ, per Sec. 250-102(c).

2100kcmil x .125 = 262.5kcmil

Step 3: Select proper size EBJ, per Table 8, Ch. 9.

262.5kcmil requires a 300kcmil Cu conductor.

Stallcup's Code Loop: Sec. 250-102(c) and Table 8, Ch. 9.

Next month's "Quizzes on the Code" will contain questions on sizing the bonding jumper and grounding electrode conductor for a separately derived system.

Find More Code Quizzes »


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues