Grounding - Art. 250

Choose the best answer:
1. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size grounded (neutral) conductor does the NEC require in each run?

(a) No. 6 (b) No. 4 (c) No. 2 (d) No. 1/0

2. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size main jumper does the NEC require to ground the bus bar to the service equipment enclosure?

(a) No. 1/0 (b) No. 4/0 (c) 250kcmil (d) 300kcmil

3. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size individual equipment-bonding jumper does the NEC require to bond each service raceway?

(a) No. 1/0 (b) No. 2/0 (c) No. 3/0 (d) No. 4/0

4. In a paralleled 3-phase, 4-wire service with three 700kcmil THWN copper conductors per phase, what size equipment-bonding jumper does the NEC require to bond all service raceways?

(a) No. 4/0 (b) 250kcmil (c) 300kcmil (d) 500kcmil

Answers and Discussion

1. (d). You size the grounded conductor no smaller than 12.5% of the area of the largest service-entrance (phase) conductors larger than 1100kcmil copper or 1750kcmil aluminum. Base the grounded conductor on the total circular mil area of the service-entrance conductors, when installed in parallel. When you install grounded conductors in two or more raceways, size them based on the size of the ungrounded service-entrance conductors, but not smaller than No. 1/0.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size grounded conductor, per Sec. 250-24(b)(2).

2100kcmil x .125 = 262.5kcmil

Step 3: Calculate proper size conductor for each conduit run.

262.5kcmil/3 = 87.5kcmil

Step 4: Select proper size grounded conductor for each conduit run, based on Table 8 in Ch. 9.

87,500 CM requires a No. 1/0 Cu conductor.

Stallcup's Code Loop: Secs. 250-24(b)(1), 250-24(b)(2), 310-4, and Table 8, Ch. 9.

2. (d). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the main bonding jumper (MBJ) to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size MBJ, per Sec. 250-28(b).

2100kcmil x .125 = 262.5kcmil

Step 3: Select proper size MBJ, per Table 8, Ch. 9.

262.5kcmil requires a 300kcmil conductor.

Stallcup's Code Loop: Sec. 250-28(d) and Table 8, Ch. 9.

3. (b). If the ungrounded service-entrance conductors aren't larger than 1100kcmil copper or 1750kcmil aluminum, size the equipment-bonding jumper (EBJ) on the supply side of the service, per Table 250-66.

Step 1: Select proper size EBJ on the supply side of the service, per Table 250-66.

700kcmil Cu requires a No. 2/0 Cu conductor.

Stallcup's Code Loop: Sec. 250-102(c) and Table 250-66.

4. (c). If the service-entrance conductors are larger than 1100kcmil copper or 1750kcmil aluminum, size the EBJ to be at least 12.5% greater than the area of the largest ungrounded (phase) conductor.

Step 1: Calculate total circular mil area of service entrance conductors.

700kcmil x 3 = 2100kcmil

Step 2: Calculate minimum size EBJ, per Sec. 250-102(c).

2100kcmil x .125 = 262.5kcmil

Step 3: Select proper size EBJ, per Table 8, Ch. 9.

262.5kcmil requires a 300kcmil Cu conductor.

Stallcup's Code Loop: Sec. 250-102(c) and Table 8, Ch. 9.

Next month's "Quizzes on the Code" will contain questions on sizing the bonding jumper and grounding electrode conductor for a separately derived system.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues