ECM Buyers' Guide
  

Quizzes on the Code

Dec 1, 2002 12:00 PM, By Mike Holt, NEC Consultant


Choose the best answer:

  1. Communications cables will be considered abandoned if they're neither terminated at both ends with a connector or other equipment nor identified for future use with a tag.
    (a) true
    (b) false

  2. Exposed communications cables must be secured to structural components by straps, staples, hangers, or similar fittings designed and installed so as to not damage the cable.
    (a) true
    (b) false

  3. When it isn't practicable to install a primary protector grounding conductor of less than 20 ft in length in one- and two-family dwellings, a separate ___ ft communications ground rod must be driven and bonded to the power grounding electrode system with a 6 AWG conductor.
    (a) 5
    (b) 8
    (c) 10
    (d) 20

  4. Communications cables installed in buildings must be listed as suitable for the purpose unless their length within the building doesn't exceed ___ ft.
    (a) 5
    (b) 25
    (c) 50
    (d) 100

  5. You must install underground coaxial cables at least 12 in. from light or power conductors, even if they're installed in a raceway or nonmetallic cable, such as UF or USE type cable.
    (a) true
    (b) false

  6. The grounding conductor used to ground masts and metal structures supporting antennas as well as each conductor of a lead-in from an outdoor antenna must be run in as straight a line as practicable from the mast or discharge unit to the grounding electrode.
    (a) true
    (b) false

  7. A coaxial cable's outer conductive shield must be grounded at the building premises as close to the point of cable entrance or attachment as practicable.
    (a) true
    (b) false

  8. All accessible portions of abandoned network-powered broadband cable must be removed.
    (a) true
    (b) false




Answers and Discussion

  1. (a), true. Because 800.52(B) requires abandoned cables to be removed, this definition was necessary to clarify which cables can stay and which must go.

  2. (a), true. The revised text in 800.6 clarifies that communications cables must be properly secured and protected from physical damage.

  3. (a), 5 ft. An Exception in 800.40(A)(4) provides an alternative for situations when it's not practicable to meet the maximum 20-ft length restriction. It references the requirements of 800.40(B)(2)(2), which requires connection to an effectively grounded metal structure or to a ground rod or pipe no less than 5 ft in length and .5 in. in diameter.

  4. (c), 50 ft. In general, communications cables installed in a building must be listed, but Exception No. 3 to 800.50 permits unlisted cable to enter the building for a distance of 50 ft.

  5. (b), false. The 12-in. separation rule doesn't apply if the light or power conductors are installed in a raceway or nonmetallic raceway, or if the coaxial cables are installed in a raceway [820.11(B)].

  6. (a), true. Per 810.21(E), you must run the grounding conductor for the antenna mast and/or antenna discharge unit in as straight a line as practicable from the mast or discharge unit to the grounding electrode. Failure to do so can cause lightning energy to be routed into the structure, rather than to the earth.

  7. (a), true. This change to 820.33 adds clarity and makes this section consistent with other communications articles in the 2002 NEC.

  8. (a), true. A new rule [830.3(A)] requires the accessible portions of abandoned cables, as defined in 830.2, to be removed in order to limit the spread of fire or by-products of combustion within a building.

Are you still confused by the Code? For additional information on Code-related topics please visit www.mikeholt.com or send an e-mail directly to the author at mike@mikeholt.com.

Find More Code Quizzes »




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues