Fill in the blank

When working with electrical systems, including multi-conductor cables, identification of conductors is an important issue. For example, on a new 480/277V, 3-phase, 4-wire system, the NEC requires you to identify conductors by phase or line and system [210.5(C)]. It is common practice to identify these ungrounded conductors with an outer finish (i.e., insulation color) that is: brown, orange, and yellow; gray for the grounded conductor; and green, green with one or more yellow stripes, or bare for the equipment grounding conductor. But when working on existing electrical systems, such as 480/277V, 3-phase, 4-wire systems, you should take care because the color __________ may have been used for an ungrounded conductor. Hint: See the Fine Print Note.

    1. white
    2. white with one or more colored stripes, other than green
    3. black with three distinctive white stripes on its entire length
    4. gray

Answer: D

As noted in the Fine Print Note of 200.6(E), "The color gray may have been used in the past as an ungrounded conductor. Care should be taken when working on existing systems." Although the FPN is cautioning electricians to be aware of the conductor with the outer gray color, it's possible that other colored conductors that are not normally used to identify ungrounded conductors may have been used as ungrounded conductors. So be careful out there!

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues