ECM Buyers' Guide
  

Code Quiz

Oct 22, 2004 9:06 AM, By Steven Owen

According to the 2005 NEC, when is a listed AFCI breaker not required, even though AFCI protection is still required for dwelling unit bedroom outlets?

A) when an AFCI is installed within 6 feet of the branch-circuit overcurrent device as measured along the branch-circuit conductors
B) when the circuit conductors between the branch-circuit overcurrent device and the AFCI are installed in a metal raceway or a cable with a metallic sheath
C) A and B
D) never

Answer: C)

Explanation: Per the addition of an exception to 210.12(B) in the 2005 NEC, it's now acceptable to omit the AFCI breaker if an AFCI device is installed within 6 feet of the branch-circuit overcurrent device as measured along the branch-circuit conductors, and the circuit conductors between the branch-circuit overcurrent device and the AFCI are installed in a metal raceway or a cable with a metallic sheath.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues