A question has arisen related to whether a storage battery installation has the required working space in accordance with the 2008 National Electrical Code. The depth of the battery rack supporting the batteries is 12 inches. It's installed tight against a concrete wall. Directly across from the battery rack is electrical switchgear rated at 600V, with a nominal operating voltage of 480V.

Based on these facts, what is the required minimum depth of the working space in the direction of live parts?

    1. 36 in. from the back edge of the battery rack to the front edge of the electrical switchgear.
    2. 42 in. from the front edge of the battery rack to the front edge of the electrical switchgear.
    3. 48 in. from the front edge of the battery rack to the terminals inside of the electrical switchgear.
    4. 48 in. from the front edge of the battery rack to the front edge of the electrical switchgear.

Answer: D

Article 480 focuses on storage batteries. As noted in 480.9(C), "Working space about the battery systems shall comply with 110.26. Working clearance shall be measured from the edge of the battery rack."

We can determine the required clearances from Table 110.26(A)(1). This particular installation falls under Condition 3, which covers "exposed live parts on both sides of the working space." Looking at the second row (151V to 600V) under the third column (Condition 3) we see that the installation calls for a minimum clearance of 4 ft.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

What's Wrong Here?

Jan 7, 2010 12:47 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues