ECM Buyers' Guide
  

Code Quiz

Oct 7, 2005 11:02 AM, By Steven Owen

Question. A small strip mall consists of the following 10 tenants: a pharmacy; a 24-hour emergency medical treatment center, which provides a limited amount of critical care; and eight different retail shops. The common service disconnecting means for the entire group of tenants is equipped with ground-fault protection (one service and 10 feeders). Does the Code require any additional level of ground-fault protection at any of the feeder disconnecting means?

A) No. An additional level of ground-fault protection is not required for this commercial occupancy.

B) No. There is no requirement for any GFCI protection at any service or feeder level for this commercial occupancy.

C) No. Similar to other health-care occupancies (generally hospital complexes), ground-fault protection is required for the feeder level (as well as the service disconnecting means). This applies only to the medical tenant as listed above.

D) Yes. Similar to other health-care occupancies (generally hospital complexes), ground-fault protection is required for the feeder level (as well as the service disconnecting means). This applies to all tenants in the example above.

Answer: D

Explanation: Section 517.17 of the 2005 NEC was revised to require a second level of selective ground-fault protection for all occupants of multiple occupancy buildings where one or more of the occupants has critical-care areas or uses electrical life-support equipment. This rule also applies to buildings that provide essential utilities or services for the operation of critical-care areas or electrical life-support equipment. The requirement is set up so that a ground-fault on any feeder in any occupancy should not trip the ground-fault protection equipment (GFPE) at the service, and therefore, initiate a power loss for all occupancies, including those that do not have critical-care life support equipment. This requirement has been in effect for some time now in health-care/hospital complexes. This change now extends the rule to retail and other similar complexes.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues