ECM Buyers' Guide
  

Code Quiz

Sep 4, 2008 4:14 PM, By Steven Owen

Q. According to the 2008 National Electrical Code, electric drinking fountains installed in public buildings, such as schools, must meet which of the following requirements:

      1. Offer GFCI protection for personnel — Class A, 5mA (nominal) trip
      2. Can't be supplied with a hermetic compressor
      3. Offer GFCI protection only if it is located within 6 feet of a 15A or 20A, 125V single-phase receptacle outlet
      4. Offer GFPE protection — Class C, 30mA trip
      5. none of the above

Answer: A

As per 422.1 and 422.52, ground-fault protection for personnel is required for electric drinking fountains. This requirement is not limited to cord-and-plug connected appliances, but also applies to direct-wired electric drinking fountains. It's important to note that phase and voltage are not specifically addressed in this new requirement. In other words, this rule does not specifically indicate an applied voltage of 125V, single-phase.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

What's Wrong Here?

Jan 7, 2010 12:47 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues