ECM Buyers' Guide
  

Code Quiz

With respect to interconnected electric power production sources (Art. 705), is it required to automatically disconnect a 3-phase primary power source from all ungrounded conductors when one of the phases opens to create a loss of power on one or more phases? For this example, exclude emergency or legally required standby systems — and exclude the exception for this rule.

    1. Yes, as per Sec. 705.42.
    2. No. This applies to single-phase systems only.
    3. No. This applies to 2-phase, 5-wire systems only.
    4. No. There is no such requirement in the 2008 NEC. This is considered a "best practice" suggestion.

Answer: A

Excluding emergency or legally required standby systems — and the exception noted in 705.42 — you are required to design and install the system to automatically disconnect a 3-phase primary power source from all ungrounded conductors when one of the phases of that 3-phase primary source opens to create a loss of power on one or more phases.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues