Q. What is the load on the service for 10 office trailers on a construction site? Each unit is identical, featuring 1,548 square foot of usable floor area. The actual number of receptacles is not known. The heating load for each unit is rated at 7kW. The cooling load for each unit is rated at 7.5 hp. Both units are 3-phase, 208VAC. The supply voltage is 208VAC, 3-phase. The construction site for these office trailers is located in southern Texas.

    1. 170,746VA
    2. 85,373VA
    3. 56,637VA
    4. 46,101VA

Answer: A

A mobile home not intended as a dwelling unit (i.e., contractor’s on-site offices) shall not be required to meet the provisions of Art. 550 pertaining to the number or capacity of the circuits required. If the supply voltage is something other than a 120V or 120/240VAC power supply system, Art. 550 does not apply. If Art. 550 does not apply, then the demand factors in Table 550.31 do not apply. In addition, Art. 551, including Table 551.73, does not apply either. And although the lighting load demand factors for dwelling units in Table 220.42 do not apply, the demand factor for “all others” in Table 220.42 does apply in this situation. The demand is at 100% (i.e., no demand).

Let’s run through the calculations required to determine the service load for these 10 mobile on-site office trailers.

(1,548 sq. ft.) X (10 units) X (3.5VA*) X (1.25 continuous load) = 67, 725VA
*Table 220.12 general lighting load for office buildings

Since the actual number of receptacles is not known we must calculate this load as follows:
(1,548 sq. ft.) X (10 units) X 1VA per sq. ft.) = 15,480VA

The cooling load is larger than the heating load so we’ll base our calculations on this figure. As per Table 430.250, the full load current of a 7.5 hp, 3-phase, 208V AC motor is 24.2A.
(24.2A) X (208V) X (1.732) = 8,718.05VA (8,718.05VA) X (10 units) = 87,180.50VA
Round up to 87,181VA

Total load = (67,725VA) + (15,480VA) + (87,181VA) = 170, 386VA

Remember there are no demand factors other than 100% applied.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues