Code Quiz
Q. What is the load on the service for 10 office trailers on a construction site? Each unit is identical, featuring 1,548 square foot of usable floor area. The actual number of receptacles is not known. The heating load for each unit is rated at 7kW. The cooling load for each unit is rated at 7.5 hp. Both units are 3-phase, 208VAC. The supply voltage is 208VAC, 3-phase. The construction site for these office trailers is located in southern Texas.
- 170,746VA
- 85,373VA
- 56,637VA
- 46,101VA
Answer: A
A mobile home not intended as a dwelling unit (i.e., contractor’s on-site offices) shall not be required to meet the provisions of Art. 550 pertaining to the number or capacity of the circuits required. If the supply voltage is something other than a 120V or 120/240VAC power supply system, Art. 550 does not apply. If Art. 550 does not apply, then the demand factors in Table 550.31 do not apply. In addition, Art. 551, including Table 551.73, does not apply either. And although the lighting load demand factors for dwelling units in Table 220.42 do not apply, the demand factor for “all others” in Table 220.42 does apply in this situation. The demand is at 100% (i.e., no demand).
Let’s run through the calculations required to determine the service load for these 10 mobile on-site office trailers.
(1,548 sq. ft.) X (10 units) X (3.5VA*) X (1.25 continuous load) = 67, 725VA
*Table 220.12 general lighting load for office buildings
Since the actual number of receptacles is not known we must calculate this load as follows:
(1,548 sq. ft.) X (10 units) X 1VA per sq. ft.) = 15,480VA
The cooling load is larger than the heating load so we’ll base our calculations on this figure. As per Table 430.250, the full load current of a 7.5 hp, 3-phase, 208V AC motor is 24.2A.
(24.2A) X (208V) X (1.732) = 8,718.05VA
(8,718.05VA) X (10 units) = 87,180.50VA
Round up to 87,181VA
Total load = (67,725VA) + (15,480VA) + (87,181VA) = 170, 386VA
Remember there are no demand factors other than 100% applied.
Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.
Want to use this article? Click here for options!
© 2012 Penton Business Media, Inc.
Latest Articles
Labeling tool
Feb 10, 2012 7:58 AM
Emergency lighting controls
Feb 9, 2012 8:40 AM
Cupertino Electric Sponsors Construction Industry Academic Competition
Feb 8, 2012 4:14 PM
Trending Articles
Acceptable Use Policy blog comments powered by Disqus
advertisement
product spotlight
Labeling tool
Feb 10, 2012 7:58 AM
The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...
View all 2012 Product Spotlights
Free Product Info
Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.