ECM Buyers' Guide
  

Code Quiz

Jul 23, 2004 1:13 PM, By Steven Owen

Consider a large industrial complex with multiple buildings. According to the 2002 NEC, what would the proper location for the plaque or directory be for the eight 3,000A feeders that are installed between the eight 2,500kVA substation, 480V secondaries located outdoors and the eight 3,000A, 480V switchgear(s) located in the electrical room(s) inside one of the industrial buildings. This complex is under single management.

A) A sign shall be placed at each feeder location denoting all other services, feeders, or branch circuits that supply that building or structure or pass through that building or structure and the area served by each.
B) A red sign shall be placed at each feeder location to denote all other services, feeders, or branch circuits that supply or pass through that building or structure and the area served by each.
C) A plaque or directory shall not be required for large-capacity, multibuilding industrial installations under single management, where it’s ensured that disconnection can be accomplished by establishing and maintaining safe switching procedures.
D) Each disconnecting means shall be marked as a service disconnect.

Answer: C

Explanation: According to Sec. 225.37, where a building or structure has any combination of feeders, branch circuits, or services passing through or supplying it, a permanent plaque or directory shall be installed at each feeder and branch-circuit disconnect location denoting all other services, feeders, or branch circuits supplying that building or structure or passing through that building or structure and the area served by each.

Exception No. 1: A plaque or directory shall not be require for large-capacity multibuilding industrial installations under single management, where it is ensured that disconnection can be accomplished by establishing and maintaining safe switching procedures.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues