ECM Buyers' Guide
  

Code Quiz

Feb 26, 2006 6:08 PM, By Steven Owen

Q. With respect to a solar photovoltaic system, a disconnecting means is required to disconnect all current-carrying conductors of a photovoltaic power source from all other conductors in a building or other structure. A switch or circuit breaker shall not be installed in a grounded conductor unless ___________. Is a bolted or terminal disconnecting means (lug) acceptable as a disconnecting means for the grounded conductor?

A) you decide it’s okay / No

B) allowed by special permission of the Authority Having Jurisdiction / No

C) the switch or circuit breaker is part of a ground-fault detection system required by 690.5 — and that switch or circuit breaker is automatically opened and indicated as a normal function of the device in responding to ground faults / Yes

D) all conductors, including the grounded conductor, are simultaneously opened by a circuit breaker / No

Answer: C

Explanation: A change to 690.13 of the 2005 NEC makes it clear that you’re not allowed to install a switch or circuit breaker in the grounded conductor path. The conditions permitting a variation to this basic rule include the requirement that the switch or circuit breaker be part of a ground-fault detection system required by 690.5, and that this switch or circuit breaker is automatically opened and indicated as a normal function of the device in responding to ground faults.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues