Jan 10, 2006 4:02 PM, By Steven Owen

Q. An equipotential plane installed at a catfish farm pond is required for the service equipment installed outdoors (adjacent to the pond), where the service equipment controls equipment is installed in and adjacent to the water. This equipotential plane shall consist of a minimum size ______ copper conductor, installed ________, and extended out a distance of at least ______ in all directions from the equipment.

A) No. 8 solid / a minimum of 3 inches beneath or embedded in the walk surface / 36 inches

B) No. 8 stranded / a minimum of 3inches beneath or embedded in the walk surface / 36 inches

C) No. 6 solid / 24 inches beneath the service entrance equipment / 42 inches

D) No. 4 solid / no requirement / 48 inches

Answer: A

Explanation: A new article was added to the 2005 NEC covering electrical wiring and equipment in or adjacent to bodies of waters. Section 682.33 of Article 682, Natural and Artificially Made Bodies of Water, requires an equipotential plane (ground grid) beneath and extending out 36 inches in all directions of service equipment and disconnecting means operated by personnel, where the disconnecting means and/or service equipment is used to control equipment in or on the water. In addition, Section 682.2 establishes a minimum 3-inch depth or embedment in the walk surface.

The requirements of this section are similar to the requirements in Section 680.26 for the grounding and bonding of swimming pools.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Find More Code Quizzes »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues