Code Quiz 

Aug 26, 2010, By Steven Owen

With respect to interconnected electric power production sources (Art. 705), is it required to automatically disconnect a 3-phase primary power source from all ungrounded conductors when one of the phases opens to create a loss of power on one or more phases? ...

Code Quiz 

Aug 12, 2010, By Steven Owen

When is it permissible to install a listed plug-in-type backfed circuit breaker in a panelboard, without an additional fastener to secure the circuit breaker, so that removal of the circuit breaker requires other than a pull to release the circuit breaker from the mounting means on the panelboard?...

Code Quiz 

Jul 22, 2010, By Steven Owen

With respect to Art. 708 Critical Operations Power Systems (COPS), where physical security is required, the physical security shall consist of which of the following items?...

Code Quiz 

Jul 8, 2010, By Steven Owen

With respect to Art. 708 Critical Operations Power Systems (COPS), from which NFPA document are rules extracted?...

Code Quiz 

Jun 24, 2010, By Steven Owen

There are five ½-in. rigid metal conduits installed underground and connected to gasoline-dispensing equipment and other associated equipment. ...

Code Quiz 

Jun 10, 2010, By Steven Owen

With respect to single-pole circuit breakers used as disconnecting means for circuits, when is the use of identified or non-identified handle ties applied to multiple single-pole circuit breakers (intended to simultaneously disconnect all conductors of the circuit, including the grounded conductor, if any) not permitted?...

Code Quiz 

May 20, 2010, By Steven Owen

When are low-voltage control equipment, relays, motors and the like permitted to be installed in compartments with exposed high-voltage energized parts or high-voltage wiring with respect to equipment that is operating at over 600V?...

Code Quiz 

May 6, 2010, By Steven Owen

When installing service equipment for services rated more than 35kV (phase-to-phase), where conductors enter a building, the conductors shall terminate in _________....

Code Quiz 

Apr 22, 2010, By Steven Owen

In a surface metal raceway that measures 4 in. by 2 in., what is the maximum number of 12 AWG THHN, 600V insulated, single conductors, operating at 480V nominal permitted?...

Code Quiz 

Apr 8, 2010, By Steven Owen

When installing a flexible cable drop to a machine that requires frequent moving, can the cable be installed directly connected to the overhead busway plug-in device (i.e., busway switch) using appropriate tension take-up support devices without an attachment plug? ...

Code Quiz 

Mar 25, 2010, By Steven Owen

When installing outlet boxes designed for the support of luminaires, what are the specifics when the luminaire weighs more than 50 lb?...

Code Quiz 

Mar 11, 2010, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...

Code Quiz 

Feb 18, 2010, By Steven Owen

With respect to Art. 240 (Overcurrent Protection), which of the following scenarios permits the use of a slash rated circuit breaker in a circuit?...

Code Quiz 

Feb 4, 2010, By Steven Owen

What is the interrupting rating of a circuit breaker that has no interrupter rating marked on it? ...

Code Quiz 

Jan 21, 2010, By Steven Owen

When installing disconnecting means for multi-wire branch circuits in temporary installations, the disconnecting means must disconnect all ungrounded conductors at the power outlet or panelboard where the branch circuit originates. ...

Code Quiz 

Jan 7, 2010, By Steven Owen

When installing underground service conductors to a building or structure, where the service conductors are installed in a trench that has 24 in. of cover, what marking is required at what distance above the underground installation? ...

Code Quiz 

Dec 17, 2009, By Steven Owen

When working with electrical systems, including multi-conductor cables, identification of conductors is an important issue. ...

Code Quiz 

Dec 3, 2009, By Steven Owen

A question has arisen related to the installation of a new 112.5kVA dry-type transformer, which is equipped with ventilated openings....

Code Quiz 

Nov 19, 2009, By Steven Owen

A branch circuit overcurrent device is a device capable of providing protection......

Code Quiz 

Nov 5, 2009, By Steven Owen

What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...

Code Quiz 

Oct 22, 2009, By Steven Owen

When installing receptacles for circuits and equipment operating at less than 50V in kitchens, laundries and other locations where portable appliances are likely to be used...

Code Quiz 

Oct 8, 2009, By Steven Owen

What is the required minimum depth of the working space in the direction of live parts?...

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | Next

what's wrong here?

What's Wrong Here?

Aug 26, 2010 11:52 AM

What's Wrong Here?

Aug 12, 2010 12:02 PM

What's Wrong Here?

Aug 1, 2010 12:00 PM

View all What's Wrong Here?

product of the week

Gangable Boxes

September 7, 2010

Gangable boxes

View all 2010 Products of the Week

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!

T4 Emissions Regulations
Aniruddha Natekar

Q. We have had emission regulation changes in the decade. Why is Tier 4 gathering so much attention? Read the answer.

Ask a Question


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Arlington MC Cable Connectors

One size fits several cable sizes when you use Arlington’s low cost, zinc diecast MC Cable Fittings...

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Making Dollars and Sense of Power Quality
Power quality issues cost you valuable time and money. In this webinar we will explore how power quality impacts your facility and bottom line. Understanding what it is, where to look and what you can do about it. View this On Demand Webinar!

Electric Vehicles are Coming
Automakers have started to launch new electric vehicles (EVs), or plug-in hybrid electric vehicles (PHEVs), in to the U.S. marketplace. EVs have the potential to revolutionize personal roadway transportation, and the "fuel" for this new breed of vehicles is electricity. View this On Demand Webinar!

Learn about the changes in this new code cycle by attending the premier source of NEC information and training: EC&M University's 2011 NEC Code Change Conferences. In two informative and interest-filled days, you’ll learn about major NEC changes that will impact your work, whether you’re an electrician, contractor, engineer, designer, or plant/facility maintenance professional.

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues