ECM Buyers' Guide

Code Q&A

Nov 18, 2005 4:05 PM, By Mike Holt


         Subscribe in NewsGator Online   Subscribe in Bloglines     

Q. Electricians in our area ground the metal conduit that runs up a utility pole to a local ground rod. Is this a Code compliant installation?

A. The NEC requires all metal raceways that contain service conductors to be grounded [250.80]. However, grounding a metal raceway to a ground rod serves no purpose in removing or reducing dangerous voltage on metal parts from a ground fault.

What is required is that all metal raceways and enclosures containing service conductors be bonded to an effective ground-fault current path in accordance with 250.4(A)(5). This can be accomplished by the installation of an equipment bonding jumper, of any length, from the top of the metal pipe to the utility secondary neutral terminal in accordance with 250.102(E).





































Commenting terms of use blog comments powered by Disqus

Want to use this article? Click here for options!

product of the week

Evaluation Software

December 1, 2008 9:59 AM

Honeywell Power Evaluation Software

View all 2008 Products of the Week

Recent Comments

Follow comments on ecmweb.com




Arc Flash Conferences   Code Change Conferences

Professionals provide answers to your questions.



Do you have any technical paper explaining IBC?

iGard Resistance Grounding Q&A BookletDownload the Resistance Grounding Q&A Booklet
I-Gard
EC&M TV

Retrofit 2-Gang TV Box(TM)

Arlington’s recessed two-gang TV BOX™ for old work allows you to mount LCD and plasma TVs, and other system components flush against the wall.

Listen
"Sizing Gen-Sets: Facts, Hints, and Good Judgment"
Listen
Sponsored By:

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Back to Top

Browse Back Issues

Browse Back Issues