ECM Buyers' Guide
  

Code Q&A

Sep 23, 2004 11:16 AM, By Mike Holt

Q. I don’t see where 300.4 limits the number of NM cables through a given opening in wood or metal framing members. I don’t want to turn the framing members into Swiss cheese and reduce their structural integrity by boring a hole for every NM cable. So how many NM cables can I install in each bored hole?

A.You’re correct, the NEC doesn’t limit the number of cables within an opening, and you must not reduce the structural strength of framing members below the requirements of the building code. However, where multiconductor NM cables are stacked or bundled longer than 24 inches, the allowable conductor ampacity, based on 90°C insulation rating of the conductors as listed in Table 310.16 [334.80], shall be adjusted in accordance with the multiplying factors contained in Table 310.15(B)(2)(a).

So what should you do? You can separate the cables after they pass through the framing members so that they aren’t bundled more than 24 inches. But you don’t have to worry about this if no more than nine current-carrying 14 AWG, 12 AWG, or 10 AWG conductors are bundled together for more than 24 inches.

New Ampacity of 14 AWG = 25A x 0.70 = 17.5A, OK with 15A protection
New Ampacity of 12 AWG = 30A x 0.70 = 21A, OK with 20A protection
New Ampacity of 10 AWG = 40A x 0.70 = 28A, OK with 30A protection [240.4(B)]

Got a Code question for Mike? Send it to him at mike@mikeholt.com.

Want to use this article? Click here for options!



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

LED light engine

November 2, 2009

LED light engine

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues