Code Q&A

Jun 23, 2004 1:48 PM, By Mike Holt
















Q. A large number of satellite professionals ground the satellite system to the nearest available water hose bib. Does the NEC permit this installation practice?

A. No. The satellite mast (810.15) and discharge unit (ground block) [810.20(C)] must be grounded (actually bonded) in accordance with 810.20. The electrode that’s suitable for this purpose includes the nearest accessible [810.40(F)(1)]:

a. Building or structure grounding electrode system (250.50).
b. Interior metal water-piping system, within 5 feet from its point of entrance [250.52(A)(1)]. (see the Figure)
c. Accessible bonding means [250.94].
d. Metallic service raceway.
e. Service equipment enclosure.
f. Grounding electrode conductor or the grounding electrode conductor metal enclosure.

Grounding the lead-in antenna cables and the mast helps in preventing voltage surges from static discharge from reaching the inner conductor of the lead-in cable. Because the satellite sits outdoors, wind creates a static charge on the dish as well as the wire attached to it. This charge can build up on the dish and cable until it jumps across an air space, often through the electronics inside the LNBF or receiver. Grounding the coaxial cable and dish to the building grounding electrode system helps in dissipating this static charge.

Nothing can prevent damage from a direct lightning strike, but grounding these systems in accordance with the NEC with proper surge protection (not NEC required) can help reduce damage to satellite equipment as well as protect other related equipment from nearby lightning strikes.

Got a Code question for Mike? Send it to him at mike@mikeholt.com.

Want to use this article? Click here for options!



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

LED light engine

November 2, 2009

LED light engine

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues