Code Quandaries: Stumped by the Code? December 2011

Your most pressing National Electrical Code (NEC) questions answered

All questions and answers are based on the 2011 NEC.

Q. What are the requirements in the 2011 NEC for the marking of service equipment with the available fault current?

    A. Service equipment in other than dwelling units must be legibly field-marked with the maximum available fault current, including the date the fault current calculation was performed — and be of sufficient durability to withstand the environment involved [110.24(A)].

    When modifications to the electrical installation affect the maximum available fault current at the service, the maximum available fault current must be recalculated to ensure the service equipment ratings are sufficient for the maximum available fault current at the line terminals of the equipment. The required field marking(s) in 110.24(A) must be adjusted to reflect the new level of maximum available fault current [110.24(B)].

    Exception: Field markings aren’t required for industrial installations where conditions of maintenance and supervision ensure that only qualified persons service the equipment.

    Q. How is the photovoltaic (PV) source circuit current calculated?

    A. The maximum PV source circuit current is calculated by multiplying the module nameplate short circuit current rating (Isc) by 125% [690.8(A)(1)]. The 125% current multiplier is due to the module’s ability to produce more current than its rated value based on the intensity of the sunlight. The PV source circuit consists of the circuit conductors between the PV modules and the terminals of the combiner or inverter DC input terminals if no combiner is used [690.2].

    The maximum PV output circuit current is equal to the sum of parallel PV source circuit currents as calculated in 690.8(A)(1) [690.8(A)(2)]. The PV output circuit consists of circuit conductors between the PV source circuit (combiner) and the DC input terminals of the inverter or DC disconnect. Let’s run through a sample calculation to help hit this point home.

    What’s the maximum PV output circuit current for two strings, each containing 23 DC modules having a nameplate Isc of 11.80A (click here to see Figure)?

    Maximum PV output circuit current = (module Isc × 1.25)* × number of strings

    = (11.80A × 1.25)* × 2

    = (14.75A)* × 2

    = 29.50A

    *As per 690.8(A)(1), “the maximum current shall be the sum of parallel module rated short circuit currents multiplied by 125%.

    Q. When adding a ceiling outlet for a new paddle fan in a bedroom, does the Code require this circuit addition to be AFCI protected?

    A. Where branch-circuit wiring is modified, replaced, or extended in any of the areas of a dwelling unit specified in 210.12(A), the branch circuit must be protected by [210.12(B)] a listed combination AFCI located at the origin of the branch circuit or a listed outlet branch circuit AFCI located at the first receptacle outlet of the existing branch circuit.

    Q. Does the NEC require that conductors be twisted together before a twist-on wire connector is installed?

    A. Conductors must be spliced by a splicing device identified for the purpose or by exothermic welding [110.14(B)]. Conductors aren’t required to be twisted together prior to the installation of a twist-on wire connector, unless specified in the installation instructions.       


    Want to use this article? Click here for options!





    Acceptable Use Policy
    blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues