Stumped by the Code? September 2011

Your most pressing National Electrical Code (NEC) questions answered

All questions and answers are based on the 2011 NEC.

Q. I’m having trouble understanding pull box calculation requirements. Can you give me an example of how to properly perform these steps?

A. For raceways containing conductors 4 AWG and larger, the minimum dimensions of boxes and conduit bodies must comply with the following [314.28(A)]:

    1. Straight pull calculations. The minimum distance from where the conductors enter the box or conduit body to the opposite wall must not be less than eight times the trade size of the largest raceway.
    2. Angle pull, U pull, or splice calculations:

    Angle pulls. The distance from the raceway entry of the box or conduit body to the opposite wall must not be less than six times the trade size of the largest raceway, plus the sum of the trade sizes of the remaining raceways on the same wall and row.

    U pulls. When a conductor enters and leaves from the same wall of the box, the distance from where the raceways enter to the opposite wall must not be less than six times the trade size of the largest raceway, plus the sum of the trade sizes of the remaining raceways on the same wall and row.

    Splices. When conductors are spliced, the distance from where the raceways enter to the opposite wall must not be less than six times the trade size of the largest raceway, plus the sum of the trade sizes of the remaining raceways on the same wall and row.

    Rows. If there are multiple rows of raceway entries, each row is calculated individually and the row with the largest distance must be used, as shown in the Figure.

    Distance between raceways. The distance between raceways enclosing the same conductor must not be less than six times the trade size of the largest raceway, measured from the raceways’ nearest edge to nearest edge.

Q. How many general use receptacles are allowed per circuit for dwelling units?

A. For dwelling units, 210.11(A) requires that the minimum number of general lighting and general-use receptacle branch circuits must be determined by dividing the total calculated load in amperes by the ampere rating of the circuits used.

    Here’s an example problem designed to help you see this requirement more clearly.

    How many 15A, 120V circuits are required for the general lighting and general-use receptacles for a dwelling having floor area of 1,500 sq ft, exclusive of an unfinished cellar not adaptable for future use [Example D1(a) in Annex D]?

    Step 1: First, determine the total load in volt-amperes:

    VA = 1,500 sq ft × 3VA per sq ft [Table 220.12] = 4,500VA

    Step 2: Next, determine the current in amperes:

    I = VA ÷ E = 4,500VA ÷ 120V = 38A

    Step 3: Now we can determine the number of circuits as follows:

    Number of circuits = 38A ÷ 15A = three 15A, or two 20A, 120V circuits

    Note: There’s no limit to the number of receptacles on a circuit in a dwelling unit.

    If the load is calculated on the volt-amperes per square foot method, the wiring system must be provided to serve the calculated load, with the loads evenly proportioned among multi-outlet branch circuits within the panelboard [210.11(A)].               

Find More Code Q&As »






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues