Q. What are the requirements for supporting communications raceways and cables above a suspended ceiling?

Proper fastening configuration in a suspended ceiling space based on code requirements.

A. Communications raceways and communications cable assemblies must be securely fastened in place, and ceiling-support wires or the ceiling grid must not be used to support communications raceways or communications cables [800.24], as shown in the Figure. Raceways and cables are permitted to be supported by independent support wires attached to the suspended ceiling [300.11].

Q. What are the NEC requirements when installing a panel or disconnect directly below another panel or disconnect?

A. Equipment such as cabinets and panels can be located above or below other electrical equipment, but it must not extend more than 6 in. into the equipment's working space [110.26(A)(3)]. Be sure that the height of the center of the grip of the operating handle of any switch or circuit breaker doesn't exceed 6 ft 7 in. in the ON position [404.8(A)].

Q. In an industrial environment, does the NEC require an equipment grounding conductor through metal raceways such as electrical metallic tubing (EMT) or rigid metallic conduit (RMC)?

A. No. The NEC requires all circuits to contain an equipment ground consisting of any one or a combination of the items listed in 250.118. Because EMT and RMC are both recognized as an equipment grounding conductor, an additional equipment grounding conductor of the wire type would not be required.

Q. How do we size the primary overcurrent device and conductors for a 45kVA transformer 480V to 120/208V?

A. The primary winding of a transformer must be protected against overcurrent in accordance with the percentages listed in Table 450.3(B) and all applicable notes.

Step 1: Determine the primary current:

I = VA ÷ (E × 1.732)

I = 45,000VA ÷ (480V × 1.732)

I = 54A

Step 2: Determine the primary overcurrent device rating [240.6(A) and 450.3(B)]:

54A × 1.25 = 68A, next size up 70A, Table 450.3(B), Note 1

Step 3: The primary conductor must be sized to carry 54A continuously (54A × 1.25 = 68A) [215.2(A)(1)] and be protected by a 70A overcurrent device [240.4(B) and 450.3(B)]. A 4 AWG conductor rated 85A at 75°C meets all of these requirements [110.14(C)(1) and 310.16].

Q. We installed fluorescent lighting in a warehouse, and the inspector says that the fixtures must have a “heavy-duty” rating because they are on a 30A circuit. Can we use 20A inline fuses to get around this issue?

A. No. The NEC specifically states that a 30A branch circuit shall be permitted to supply fixed lighting units with heavy-duty lampholders. According to 210.3, the rating of a branch circuit is determined by the rating of the branch-circuit overcurrent device. An inline fuse is a supplementary overcurrent device [Art. 100], and it's not permitted to serve as the required branch-circuit overcurrent device [240.10].

Q. We have interconnected office furniture, and the inspector says we need to have simultaneous disconnect for all circuits that feed the furniture. If we have four circuits supplying office furniture, am I required to have handle ties for all four circuits (4-wire and 2-wire)?

A. No. The requirement is that “multiwire branch circuits” must have a means to simultaneously disconnect all ungrounded conductors at the point where the branch circuit originates [210.4(B) and 605.6]. Individual single-pole circuit breakers with handle ties identified for the purpose, or a breaker with common internal trip, can be used for this application [240.15(B)(1)]. In your example, you must only simultaneously disconnect all of the circuits connected to the 4-wire circuit.

Caution: This rule is intended to prevent people from working on energized circuits they thought were disconnected.

According to Art. 100, a multiwire branch circuit consists of two or more ungrounded circuit conductors with a common neutral conductor. There must be a difference of potential (voltage) between the ungrounded conductors and an equal difference of potential (voltage) from each ungrounded conductor to the neutral conductor.

Find More Code Q&As »






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues