ECM Buyers' Guide
  

Code Quandaries

Here are the latest short answers to questions posted on our Web site. In our discussion, we will cover topics from Secs. 210-4(a), 210-11(c)(3), 250-50, 250-104(a), and 310-8(d); Art. 210; and Table 250-66 of the National Electrical Code (NEC).

Q. The local inspector turned down my job for using THHN outside the weather head for service entrance conductors. He said I had to mark the conductors "sunlight resistant." I've been doing this for more than 15 years, and this is a first for me! Is he correct?

A. Yes. This is a new requirement in the 1999 NEC, added in Sec. 310-8(d). The exact text reads, "Insulated conductors and cables used where exposed to direct rays of the sun shall be of a type listed or marked 'sunlight resistant.' " According to the UL White book, page 114, THHN, THHW, and THWN conductors that comply with an artificial weathering test are marked "sunlight resistant."

Q. To quickly remove dangerous voltage resulting from a phase-to-ground fault, you must bond the interior metal water pipe system to the system grounded conductor. How is this copper bonding conductor sized? How does the size of the service affect the sizing of this bonding jumper? Must the bonding connection to the interior pipe be within 5 ft of the water pipe's point of entry into the building?

A. Because the bonding jumper must carry fault current (to assist in clearing a fault), you use the service conductor size to determine the interior metal water pipe bonding conductor. Sec. 250-104(a) specifies the bonding jumper shall be sized in accordance with Table 250-66, based on the size of the largest service-entrance conductor. Here's an example of the use of Table 250-66 for different size services: The bonding of the interior metal water pipe system is not required to be within 5 ft of the entrance of the metal water pipe into the building.

Note: The 5-ft water pipe limitations in Sec. 250-50 only apply when you use the water pipe as a conductor to interconnect electrodes that are part of the grounding electrode system.

Q. I supplied the bathroom receptacles from one circuit of No. 12/3 nonmetallic sheath cable. I used the other circuit (common neutral) to supply other loads. Does this meet NEC requirements?

A. Yes. You can use a multiwire branch circuit to supply the 20A branch circuit for bathroom receptacles, as required in Sec. 210-11(c)(3). You can find the answer in Sec. 210-4(a), which states you can use a multiwire branch circuit to supply any of the circuits required by Art. 210. This rule also considers a multiwire branch circuit as two multiple circuits.

Q. What are the NEC requirements for installation of fire and/or smoke detectors in a dwelling unit?

A. None. The NEC does not cover this subject, but the Life Safety Code NFPA-101 does.

Find More Code Q&As »






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues