Jun 1, 2002 12:00 PM, By Mike Holt, NEC Consultant


Knowing how important NEC issues are to our readers, we're introducing a new online Code Q&A column. Updated weekly, visit this link for answers to your latest Code questions and concerns.


Q. I know 250.32 allows you to bond the grounded (neutral) circuit conductor that supplies a building to the equipment grounding conductor at an accompanying remote building. This is the case at the campus I’m currently working at, but the grounding electrode system of the second building is also connected to the grounded (neutral) conductor. If the two buildings were electrically connected via a conductive path, such as the shielding of a coax cable or water pipe, this would provide an alternate path for neutral current to flow during normal operation (like resistors in parallel). Do you know of any problems that can arise from a situation such as GFI relays in the main service? Everyone I’ve discussed this with has dismissed it as trivial. Are they right?

A. The practice of bonding the grounded (neutral) conductor to the equipment enclosure is only permitted by 250.32(B)(2) where all of the following conditions exist:

  • An equipment grounding conductor is not run with the supply to the building or structure.

  • There are no continuous metallic paths bonded to the grounding system in both buildings or structures involved.

  • There is no ground-fault protection of equipment on the common AC service.

In addition, the grounded conductor may not be smaller than the larger of that required by 220.22 (maximum unbalanced neutral load) or 250.122 (equipment grounding conductor size).

When an equipment grounding conductor doesn’t run to a separate building or structure, you must use the grounded (neutral) conductor to provide the effective ground-fault current path required to clear any ground-faults (line-to-case faults) in addition to carrying any unbalanced neutral current [250.4(A)(3)].

Find More Code Q&As »

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues