Q. I need to run a feeder to a pool house panel. What are the wiring methods required for this type of installation?

A. The requirements are contained in 680.25, and read as follows:

Feeder conductors to panelboards containing permanently installed pool, outdoor spa, or outdoor hot tub equipment circuits must be installed in rigid metal conduit, intermediate metal conduit, liquidtight flexible nonmetallic conduit, or PVC conduit. Electrical metallic tubing is permitted where installed on or within a building, and electrical nonmetallic tubing is permitted where installed within a building. An Exception to this requirement allows branch circuits for permanently installed pool, outdoor spa, or outdoor hot tub equipment to originate from an existing panelboard, where the existing feeder contains an equipment grounding conductor within the outer sheath of a cable.

An insulated copper or aluminum equipment grounding conductor must be installed with the feeder conductors between the grounding terminal of the pool, outdoor spa, or outdoor hot tub equipment panelboard and the grounding terminal of the applicable service equipment. This feeder equipment grounding conductor must be sized according to 250.122, but be no smaller than 12 AWG.

Where a feeder is run to a separate building or structure to supply permanently installed swimming pool, outdoor spa, or outdoor hot tub equipment, an insulated equipment grounding conductor must be installed with the feeder conductors to the disconnecting means at the separate building or structure [250.32(B)].

Find More Code Q&As »




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Aug 26, 2010 11:52 AM

What's Wrong Here?

Aug 12, 2010 12:02 PM

What's Wrong Here?

Aug 1, 2010 12:00 PM

View all What's Wrong Here?

product of the week

Gangable Boxes

September 7, 2010

Gangable boxes

View all 2010 Products of the Week

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!

T4 Emissions Regulations
Aniruddha Natekar

Q. We have had emission regulation changes in the decade. Why is Tier 4 gathering so much attention? Read the answer.

Ask a Question


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Arlington MC Cable Connectors

One size fits several cable sizes when you use Arlington’s low cost, zinc diecast MC Cable Fittings...

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Making Dollars and Sense of Power Quality
Power quality issues cost you valuable time and money. In this webinar we will explore how power quality impacts your facility and bottom line. Understanding what it is, where to look and what you can do about it. View this On Demand Webinar!

Electric Vehicles are Coming
Automakers have started to launch new electric vehicles (EVs), or plug-in hybrid electric vehicles (PHEVs), in to the U.S. marketplace. EVs have the potential to revolutionize personal roadway transportation, and the "fuel" for this new breed of vehicles is electricity. View this On Demand Webinar!

Learn about the changes in this new code cycle by attending the premier source of NEC information and training: EC&M University's 2011 NEC Code Change Conferences. In two informative and interest-filled days, you’ll learn about major NEC changes that will impact your work, whether you’re an electrician, contractor, engineer, designer, or plant/facility maintenance professional.

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues