Code Q&A

Q. What are the acceptable wiring methods for photovoltaic (PV) circuits inside buildings/structures?

A. PV system DC conductors (source and output) run inside a building/structure must be contained in a metal raceway, Type MC cable, or metal enclosure [690.31(E)]. Wiring methods cannot be located within 10 in. of the roof decking or sheathing, except where located directly below the roof surface that's covered by PV modules and associated equipment and must be run perpendicular (90°) to the roof penetration point [690.31(E)(1)]. Note: The 10 in. from the roof decking/sheathing requirement is to prevent accidental contact with energized conductors from saws used by firefighters for roof ventilation during a structure fire.

FMC smaller than trade size ¾ in. or Type MC cable smaller than 1 in. in diameter installed across ceilings or floor joists must be protected by substantial guard strips that are at least as high as the wiring method. Where run exposed, other than within 6 ft of their connection to equipment, wiring methods must closely follow the building surface or be protected from physical damage by an approved means [690.31(E)(2)].

Wiring methods and enclosures containing PV source conductors must be marked with the wording "Photovoltaic Power Source" by labels or other approved permanent marking means [690.31(E)(3)]. The marking required by 690.31(E)(3) must be visible after installation and appear on every section of the wiring system separated by enclosures, walls, partitions, ceiling, or floors. Spacing between labels/marking must not be more than 10 ft, and labels must be suitable for the environment [690.31(E)(4)].

Find More Code Q&As »






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues