Q. What are the bonding requirements for transformers?

A. As noted in 250.30(A) of the 2008 NEC, a system bonding jumper must be installed at the same location where the grounding electrode conductor terminates to the neutral terminal of the separately derived system; either at the separately derived system or the system disconnecting means, but not at both locations [250.30(A)(1)].

If installed at the source, the system bonding jumper must connect the neutral conductor to the equipment grounding conductor of the metal transformer case. If installed at the first disconnecting means, the system bonding jumper must connect the neutral conductor to the equipment grounding conductor of the metal disconnecting means enclosure.

For clarification purposes, a system bonding jumper is a conductor, screw, or strap that bonds the metal parts of a separately derived system to a system neutral point [250.2]. It's sized to Table 250.66 in accordance with 250.28(D).

Danger: During a ground fault, metal parts of electrical equipment, as well as metal piping and structural steel, will become and remain energized, providing the potential for electric shock and fire if the system bonding jumper isn't installed.

If the separately derived system and the first disconnecting means are located in separate enclosures, a supply-side equipment bonding jumper must be run to the secondary system disconnecting means. Where the supply side equipment grounding conductor is of the wire type, it must be sized in accordance with Table 250.66, based on the area of the largest ungrounded secondary conductor in the raceway or cable. This conductor is not required to be larger than the derived circuit conductors [250.30(A)(2)].

Where the system bonding jumper is installed at the disconnecting means instead of at the source, the following requirements apply:

  • Sizing for single raceway. Because the secondary neutral conductor serves as the effective ground-fault current path for ground-fault current, it must be routed with the secondary conductors and sized not smaller than specified in Table 250.66, based on the area of the secondary conductors.
  • Parallel conductors. If the secondary conductors are installed in parallel, the secondary neutral conductor in each raceway or cable must be sized not smaller than specified in Table 250.66, based on the area of the largest ungrounded conductor in the raceway or cable. In no case is the neutral conductor permitted to be smaller than 1/0 AWG [310.10(H)].
Where the system bonding jumper is installed at the disconnecting means instead of at the source, an equipment bonding conductor must connect the metal parts of the separately derived system to the neutral conductor at the disconnecting means in accordance with 250.30(A)(2).

Find More Code Q&As »




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues