Q. What are the bonding requirements for transformers?

A. As noted in 250.30(A) of the 2008 NEC, a system bonding jumper must be installed at the same location where the grounding electrode conductor terminates to the neutral terminal of the separately derived system; either at the separately derived system or the system disconnecting means, but not at both locations [250.30(A)(1)].

If installed at the source, the system bonding jumper must connect the neutral conductor to the equipment grounding conductor of the metal transformer case. If installed at the first disconnecting means, the system bonding jumper must connect the neutral conductor to the equipment grounding conductor of the metal disconnecting means enclosure.

For clarification purposes, a system bonding jumper is a conductor, screw, or strap that bonds the metal parts of a separately derived system to a system neutral point [250.2]. It's sized to Table 250.66 in accordance with 250.28(D).

Danger: During a ground fault, metal parts of electrical equipment, as well as metal piping and structural steel, will become and remain energized, providing the potential for electric shock and fire if the system bonding jumper isn't installed.

If the separately derived system and the first disconnecting means are located in separate enclosures, a supply-side equipment bonding jumper must be run to the secondary system disconnecting means. Where the supply side equipment grounding conductor is of the wire type, it must be sized in accordance with Table 250.66, based on the area of the largest ungrounded secondary conductor in the raceway or cable. This conductor is not required to be larger than the derived circuit conductors [250.30(A)(2)].

Where the system bonding jumper is installed at the disconnecting means instead of at the source, the following requirements apply:

  • Sizing for single raceway. Because the secondary neutral conductor serves as the effective ground-fault current path for ground-fault current, it must be routed with the secondary conductors and sized not smaller than specified in Table 250.66, based on the area of the secondary conductors.
  • Parallel conductors. If the secondary conductors are installed in parallel, the secondary neutral conductor in each raceway or cable must be sized not smaller than specified in Table 250.66, based on the area of the largest ungrounded conductor in the raceway or cable. In no case is the neutral conductor permitted to be smaller than 1/0 AWG [310.10(H)].
Where the system bonding jumper is installed at the disconnecting means instead of at the source, an equipment bonding conductor must connect the metal parts of the separately derived system to the neutral conductor at the disconnecting means in accordance with 250.30(A)(2).

Find More Code Q&As »






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues