An existing corporate data center is concerned about possible loss of power due to the fact that it is supplied by only one service. The existing feed consists of a 1600A, 208Y/120V, 3-phase, four-wire service. Data center management personnel propose to add an additional service.

Q. An existing corporate data center is concerned about possible loss of power due to the fact that it is supplied by only one service. The existing feed consists of a 1600A, 208Y/120V, 3-phase, four-wire service. Data center management personnel propose to add an additional service. What are the Code-compliant options available to the data center management team?

A) An additional service cannot be added; this is a violation of 225.30.

B) An additional service can only be added if the capacity requirements exceed 2000A.

C) An additional service can only be added if it is of different characteristics. For example, it is a single-phase, 240/120V, 3-wire service.

D) An additional service identical to the existing service may be installed for “enhanced reliability.”

Answer: D

Explanation: Per a change to 230.2(A)(6) of the 2005 NEC, an additional service per 230.2(A)(6) or an additional feeder per 220.30(A)(6) may be installed for the purpose of “enhanced reliability.” The additional service or feeder may be identical to the existing service or feeder.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at [email protected].

About the Author

Steven Owen

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.