Motors, Motor Circuits, and Controllers, Oh My!
May 1, 2004, By Mike Holt, NEC Consultant
Don’t be intimidated by the largest chapter of the NEC...
Installation and operation of optional standby systems
Apr 23, 2004, By Mike Holt
With last year’s blackout still lingering on the minds of many, the use of optional standby power systems is worth a closer look. ...
Cords and Fixture Wires
Apr 1, 2004, By Mike Holt, NEC Consultant
Correctly applying the requirements of Art. 400 and 402 can prevent serious problems...
Art. 300: Wiring Methods
Mar 1, 2004, By Mike Holt, NEC Consultant
After a small engine plant began experiencing severe power quality problems and the subsequent investigation showed the wireways weren't electrically...
Art. 240: Overcurrent Protection
Feb 1, 2004, By Mike Holt, NEC Consultant
Art. 240: Overcurrent Protection...
Tune In to the Requirements of Art. 820
Dec 1, 2003, By Mike Holt, NEC Consultant
Tune In to the Requirements of Art. 820...
Speak the Same Language and Avoid Trouble
Oct 1, 2003, By Mike Holt, NEC Consultant
Speak the Same Language and Avoid Trouble...
Make Your Next Optical Fiber Installation Shine
Sep 1, 2003, By Mike Holt, NEC Consultant
Make Your Next Optical Fiber Installation Shine...
Fire Alarm Signaling Systems
Aug 1, 2003, By Mike Holt, NEC Consultant
Fire Alarm Signaling Systems...
Making Temporary Installations Safe for All Trades
May 1, 2003, By Mike Holt, NEC Consultant
Making Temporary Installations Safe for All Trades...
Navigating the NEC's Rules for Bodies of Water
Mar 1, 2003, By Mike Holt, NEC Consultant
Navigating the NEC's Rules for Bodies of Water...
Preventing Fires at the Gas Pump
Feb 1, 2003, By Mike Holt, NEC Consultant
Preventing Fires at the Gas Pump...
Wiring Commercial Garages and Repair and Storage Facilities
Jan 1, 2003, By Mike Holt, NEC Consultant
Wiring Commercial Garages and Repair and Storage Facilities...
Separate the Arresters From the Suppressors
Oct 1, 2002, By Mike Holt, NEC Consultant
Separate the Arresters From the Suppressors...
Prevent Shocks in Your Communications
Sep 1, 2002, By Mike Holt, NEC Consultant
Prevent Shocks in Your Communications...
Understanding the Rules for Feeder Taps
Jun 1, 2002, By Mike Holt, NEC Consultant
Understanding the Rules for Feeder Taps...
Application Guidelines for Service Conductors
May 1, 2002, By Mike Holt, NEC Consultant
Application Guidelines for Service Conductors...
Addressing Arc Faults in the 2002 NEC
Apr 1, 2002, By Mike Holt, NEC Consultant
Addressing Arc Faults in the 2002 NEC...
NEC requirements for ground-fault circuit interrupters (GFCI)
Mar 1, 2002, By Mike Holt, NEC Consultant
NEC Updates Make Rules for GFCIs More Inclusive...
Adequate Workspace Keeps Electricians Safe
Feb 1, 2002, By Mike Holt, NEC Consultant
Adequate Workspace Keeps Electricians Safe...
Splices and Terminations of Conductors
Jan 1, 2002, By Mike Holt, NEC Consultant
Splices and Terminations of Conductors...
Determining Working Clearances
Aug 1, 2001, By James Stallcup, Sr., NEC Consultant
Determining Working Clearances...
Designing a Pumped-Up Power System
May 1, 2001, By James Stallcup, Sr., NEC Consultant
Designing a Pumped-Up Power System...
Pumping Up Power to Oil-Well Units
Apr 1, 2001, By James Stallcup, Sr., NEC & OSHA Consultant
Pumping Up Power to Oil-Well Units...
Installing Custom-Made Equipment Correctly
Feb 1, 2001, By James Stallcup
Installing Custom-Made Equipment Correctly...




































