Cable testing usually is part of construction acceptance testing. Cable acceptance tests give you the "as-built" cable data. Unfortunately, few owners have the important "as-startup-tested" cable test data. Configuration changes, inadvertent physical damage, and misoperation during start-up testing can stress power cables, making cable condition worse than "as-built" tests indicate.

Smart owners test cables during start-up testing, typically on each system after concluding dynamic start-up testing of that system. It’s better to correct cable deficiencies during start-up testing than to go dark in the middle of a critical production run six months later.

Smart owners trend cable test data from day one, with "as-built" data forming the baseline. The data trending curve slopes gradually in a healthy cable. A sudden break in the curve is like the red zone on a gauge.

Without baseline data, you may already be past that break. You may be comparing abnormal data to abnormal data and conclude you don’t have a problem. Trend all cable test data, and conduct baseline testing on any new cables.

 

Want to use this article? Click here for options!


MRO Insider

Safety

Mar 9, 2010 12:46 PM

The best protection against arc blast is "don’t be there." This, however, isn't always possible. The next best precaution is...

NEC in the Facility

Mar 9, 2010 12:43 PM

Most facilities today have surge arresters on the building supply (service). These are typically bought on a budget mentality that results in a waste of the entire investment. It doesn't have to be that way...

Failed Repairs

Mar 9, 2010 12:42 PM

A repair that isn't done correctly is a failure waiting to happen. Some common errors include...

Electrical Troubleshooting Quiz

Mar 9, 2010 12:27 PM

A rash of motor failures has afflicted your plant. Your plant engineer read some application notes from the Web site of a test instrument manufacturer and subsequently used a power analyzer on the feeders of these motors...




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues