NEC in the Facility: Load Calculations, Part 1

Aug. 28, 2012
The NEC also contains an Article providing requirements for outside branch circuits and feeders (225).

Requirements for branch circuits, feeders, and services each have their own Articles (210, 215, and 230, respectively). The NEC also contains an Article providing requirements for outside branch circuits and feeders (225).

When performing the load calculations for any of these circuits, you must follow Art. 220. The requirements of Art. 220 are modified or replaced in other Articles, for specific types of loads. Table 220.3, which occupies nearly a whole page, lists these loads and the additional Articles to apply.

The typical industrial or commercial facility has load-side distribution at 480V, with 480V transformer(s) center-tapped to provide 277V for lighting. Branch-circuit panel supply transformers step down 480V to 120V. The NEC lists these and other typical voltages as nominal voltages to use for load calculations (unless otherwise specified) [220.5].

"Nominal voltage" is sometimes a point of confusion. Suppose you want to add loads to an existing panel and must do load calculations. So you measure 115V on a snap-in breaker at the panel. Should you use 115V for your calculations? No; the nominal voltage is 120V. If you look at the transformer nameplate, it will probably say 208Y/120V.

Another point of confusion is what to do with fractions of an ampere. The NEC permits you to round off to the nearest whole number [220.5(B)].

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...