ECM Buyers' Guide
  

NEC in the Facility

In our previous two issues, we discussed how studying Example 3(a) in Annex D is beneficial. Example D10 is another NEC resource worth spending time on. Unlike D3(a), it includes a figure that illustrates the application.

The problem is one of determining feeder capacity for six identical elevators. This isn't a typical application in MRO for facilities, but the example provides useful insights to apply to other applications.

The example uses five steps to arrive at the total feeder ampacity.

Since each of the six loads is supplied by its own transformer, your first step in load determination is to calculate the current draw of that transformer. Multiply by the number of transformers, and you have the total conductor ampacity (step two).

For step three, apply the demand factor. For step four, apply the 125% rule to the controller. And, finally add all of these ampacities for your total ampacity.

This example doesn’t take long to walk through, so where does the "spend time on it" part come in? Most industrial and many commercial facilities make extensive use of large motors and large variable speed drives. Instead of elevators, maybe your facility has six 30-ton chillers or six large plant air compressors.

Work through D10 again, but this time use your own actual loads and draw your own application figure instead of using Figure D10. In addition to making you sharper on feeder calculations, doing this exercise means you'll be checking your actual installation against the Code. This could prove especially beneficial if there have been equipment upgrades since those feeders were first installed or if you're planning upgrades.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues