upiterimages/Creatas/Thinkstock
Ecmweb 7646 Clock2

More Preventive Maintenance in Less Time, Part 7

Aug. 3, 2015
Try observing someone perform a maintenance PM from start to finish.

How can you identify time-wasters in your maintenance practices? Try observing someone perform a maintenance PM from start to finish. As the work progresses, identify the actions taken to complete each step (as delineated in the PM procedure).

Actions differ from steps. It may be a step to perform voltage measurements. It’s an action to remove a cover to get to the measurement points. It’s also an action if the tech encounters a locked door and must walk across the plant to sign out a key for it; make the key sign-out a step (in the proper sequence, before going to the work site) to eliminate the action of walking back to get the key.

You can do much to eliminate unnecessary actions. Be careful about eliminating steps; make that call on the technical merits of the step rather than on the need to save time performing the work.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Strut Comparison Chart

Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

NECA Manual of Labor Rates Chart

See how Champion Fiberglass compares to PVC, GRC and PVC-coated steel in installation.

Electrical Conduit for Bridges Guide

Learn about electrical conduit for bridge projects.