Maintenance Misalignment, Part Two

Aug 11, 2009 12:00 PM

If your maintenance program is misaligned with your mission, resources, or priorities, how can you line it back up? Here’s a way to get started:

  • Access maintenance records for the past year.
  • Sort completed maintenance activities by labor cost (or time spent), greatest to least.
  • Plot the activities on a bar chart, in descending order of labor cost.
Now you can clearly see which activities consume the most maintenance labor. By addressing those activities first, you maximize recovery of wasted resources.

Now, review each activity to see if you should do it less frequently, outsource it, or discontinue it altogether. Answer these four questions:

  1. Why do we want to do this (what’s the gain)?
  2. How does it affect safety or the uptime of critical equipment?
  3. What is required for us to do this properly?
  4. Is this activity a better use of our resources than other things we aren’t doing adequately?
Your computerized maintenance management system (CMMS) should have tools for Pareto analysis (e.g., bar charts) and/or data export. If not, look for a CMMS that does.

Want to use this article? Click here for options!


MRO Insider

Safety

Mar 9, 2010 12:46 PM

The best protection against arc blast is "don’t be there." This, however, isn't always possible. The next best precaution is...

NEC in the Facility

Mar 9, 2010 12:43 PM

Most facilities today have surge arresters on the building supply (service). These are typically bought on a budget mentality that results in a waste of the entire investment. It doesn't have to be that way...

Failed Repairs

Mar 9, 2010 12:42 PM

A repair that isn't done correctly is a failure waiting to happen. Some common errors include...

Electrical Troubleshooting Quiz

Mar 9, 2010 12:27 PM

A rash of motor failures has afflicted your plant. Your plant engineer read some application notes from the Web site of a test instrument manufacturer and subsequently used a power analyzer on the feeders of these motors...




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues