Maintaining Your Spare Parts

It can be difficult to explain to the boss why you need a second outage to replace a part you had in stock just prior to the first outage. How can you prevent a "we didn't know it wouldn't work" fiasco?

General tips:

  1. Before adding a replacement part to inventory, check the part number, size, and other identifying specs against your required inventory documentation.
  2. Nothing goes into the stockroom without being properly labeled.
  3. The storage area may appear to be dry due the absence of a roof leak (water ingress), but it can still be humid enough for spare parts to corrode. Consider using a dehumidifier.

When certain kinds of parts are received, temporarily put them in a holding area or on unapproved status. Add them to inventory only after completing pre-inventory assurance. For example:

  1. Fuses. Visually inspect for damage (e.g., cracked body). Read the fuse indicator, or test with an ohmmeter (better still, test with a high-voltage resistance tester).
  2. Motors. Manually rotate rotor, listen for grating, and test for runout with a dial indicator.
  3. Critical circuit breakers. Conduct the recommended static testing or PM.
  4. Critical cabling. Conduct insulation resistance testing, and record baseline data.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues