Simple failure-mode analysis consists of looking up the description of a failure (that's the "mode" we're talking about) in a chart and seeing the corresponding cause. For example, the chart might show "burnt winding" and list "overheating" as one of the possible causes.

However, this approach is often too simplistic. What caused the overheating? Did unbalanced voltage do the deed? Perhaps misalignment and vibration were the villains — the motor is drawing more current to do the same amount of useful work.

A complete failure-mode analysis requires going all the way back to the root cause of the condition. Solve that cause, and the entire chain of causes for that mode disappears. Use a multi-layered approach to failure-mode analysis to get at the source issue.

Want to use this article? Click here for options!


MRO Insider

NEC in the Facility

Jan 15, 2010 3:14 PM

Does your facility have any areas used for spraying, dipping, or coating processes? If these operations run regularly, you must apply Art. 516 [516.1]....

Make Procedures Helpful, Part 3

Jan 15, 2010 3:12 PM

A common problem with repair procedures for complex equipment is that the sheer amount of text they include makes them unwieldy and, often, overwhelming...

Electrical Troubleshooting Quiz

Jan 15, 2010 3:10 PM

The plant air system has shut down in the middle of a critical production run three times in the past month. Each time, a blown fuse had to be replaced...

NEC in the Facility

Jan 4, 2010 4:36 PM

Retrofits, upgrades, and additions can result in a change to the "total load" used for sizing service conductors....




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

What's Wrong Here?

Jan 7, 2010 12:47 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues