Electrical Troubleshooting Quiz

Jul 21, 2009 11:22 AM

Your facility has a small IT room that contains its servers. Each server rack receives power through its own rack-mounted UPS. The UPS event logs show frequent voltage spikes and repeated bouts of high THD (total harmonic disturbance). This room is on its own power transformer and panel (a separate transformer/panel supplies the lights). The receptacles are all isolated ground.

Using a UPS as a crutch instead of as insurance is tempting fate. You need to solve this problem before a UPS gets cooked. Where are the spikes and high THD coming from?

Your first clue is the use of isolated ground. The concept of "isolated ground" is actually referring to deferred bonding. It really has nothing to do with grounding (see NEC Art. 100 definitions). Essentially, you're insulating things so that you connect the supply end of the bonding jumper at a point near the source rather than the load (see IEEE Standard 142).

The typical IG installation is incorrect, adding problems that weren't there without it. In most cases where an IG is implemented:

  • It's done instead of meeting the basic requirements provided in IEEE Standard 142.
  • It doesn't solve any problems, even if implemented correctly.
  • It's implemented in a way that allows potential to exist between metallic objects.
This last item is probably the underlying problem here. If you're seeing spikes on the UPS event logs and those UPSs are supplied by IGs, suspect bonding errors in the IG implementation. Refer to IEEE Standard 142 for correct implementation, or forego the IG altogether. Though the UPSs have protected your servers thus far, they aren't intended to bandage errors that violate applicable codes and standards. Your current situation may nullify your UPS warranty.

The spikes may be originating outside the room. Use a power analyzer on the supply side of the transformer to see what you're dealing with.

"Dirty power" may be coming from inside that room — whether also coming from outside or not. Look at the other loads on that panel. Typically, where there are computers there are also printers and scanners. Does the room have a laser printer? If so, run power from a different panel just for this kind of noisy load.

Want to use this article? Click here for options!


MRO Insider

NEC in the Facility

Jan 15, 2010 3:14 PM

Does your facility have any areas used for spraying, dipping, or coating processes? If these operations run regularly, you must apply Art. 516 [516.1]....

Make Procedures Helpful, Part 3

Jan 15, 2010 3:12 PM

A common problem with repair procedures for complex equipment is that the sheer amount of text they include makes them unwieldy and, often, overwhelming...

Electrical Troubleshooting Quiz

Jan 15, 2010 3:10 PM

The plant air system has shut down in the middle of a critical production run three times in the past month. Each time, a blown fuse had to be replaced...

NEC in the Facility

Jan 4, 2010 4:36 PM

Retrofits, upgrades, and additions can result in a change to the "total load" used for sizing service conductors....




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

What's Wrong Here?

Jan 7, 2010 12:47 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues