In this episode, Russ shows us several runs of flexible metal conduit (FMC) that clearly violate the requirements outlined in Sec. 358.30 of the 2014 NEC. It appears the installer was in a rush and forgot to properly support his work.
In this episode, Russ shows us several runs of flexible metal conduit (FMC) that clearly violate the requirements outlined in Sec. 358.30 of the 2014 NEC. It appears the installer was in a rush and forgot to properly support his work.