ECM Buyers' Guide
  

U.S. Construction Market Remains Soft, Despite Pickup in Government Projects

U.S. Construction market remains soft, despite pickup in government projects, according to the latest from McGraw-Hill Construction forecast

While construction is still in the doldrums, some signs of recovery are starting to shine through the wreckage. That was the message Robert Murray, vice president of economic affairs for McGraw-Hill Construction, New York, conveyed in his company's annual construction forecast recently. Indicating that a lift in public works construction is in line with his 2009 forecast, Murray suggests public works will help cushion the weakness he still expects for overall construction activity.

“The public works sector in March was supported by several large projects, and in a few months the upward push will become more broad-based as funding from the federal stimulus package begins to have an impact at the construction site, especially as it relates to transportation public works,” he said. “The prospects for nonresidential building in 2009 are less hopeful, given the persistently tight lending environment and further erosion on the employment front. As for housing, while the declines are likely to be less severe as 2009 proceeds, to this point the housing sector is still in the process of reaching bottom.”

The McGraw-Hill report showed a 3% drop in nonresidential building in March 2009 to an annual rate of $153.8 billion, and a 48% decline over February 2009 in the office building sector. The report said February's numbers had been helped out by the start of a $922-million headquarters for the U.S. Army in Alexandria, Va. The company's March forecast included another large government project — $260 million in renovation work at the Pentagon in Arlington, Va.

“While 2009 is shaping up as a tough year for private sector office construction, government-related office projects are seeing relatively strong activity, which should be enhanced over the coming year, given the stimulus funding directed at energy-efficiency upgrades to federal buildings,” said Murray.

Other large projects now underway across the United States include a $237-million university building in Palo Alto, Calif., and a $250-million terminal renovation project at San Francisco International Airport.

While the most recent statistics still paint a bleak picture for the current construction climate, McGraw-Hill's report on March construction activity indicates the year-to-year declines compared to 2008 were not quite as bad as they look on the surface, because the numbers for early 2008 included the start of some “exceptionally large” construction projects, such as the $7 billion Motiva refinery expansion in Port Arthur, Texas; three towers at the World Trade Center site in lower Manhattan with a combined construction start cost of $3.9 billion; and the $1.1-billion Revel Resort and Casino in Atlantic City, N.J. If these five large projects are excluded from the January-March 2008 statistics, Murray said nonresidential building for the first three months of 2009 would be down 35% from a year ago, as would total construction. Its forecast currently shows a 40% drop for total construction from the same period a year ago and a 47% decline for nonresidential construction.

This article was reprinted with permission from the May 8, 2009 edition of Electrical Marketing, a sister publication to EC&M.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues