ECM Buyers' Guide
  

Customers Demand Flexibility from Demand Response Programs

Utilities can expand participation in demand response (DR) programs among large commercial and industrial electricity users through greater compensation and flexibility, according to a recent report issued by the San Francisco-based Lawrence Berkeley National Laboratory (LBNL).

The report presents the results of market research conducted by Houston-based Nextant and San Francisco-based Freeman Sullivan Co. in which six focus groups of commercial and industrial electricity users from Arizona, Delaware, New Jersey, and Illinois discussed the important factors affecting their willingness to participate in a DR program.

The incentive structure of a DR program ranked the highest in importance with these customers. Many participants also indicated the desire to be able to tailor their participation in DR programs in ways that better reflect the technical and operational needs of their businesses.

These focus groups came up with several user-friendly DR program ideas facilities managers, energy managers, and plant engineers may be able to take advantage of in the future, including:

Opt-out and opt-in windows. This plan allows customers to designate a specific block of time during the peak demand season in which they will not be called to shed load (opt-out), as well as designated blocks of time in which they would be willing to shed load (opt-in).

Tiered incentives tied to flexibility. This plan provides customers with the flexibility to scale-up or scale-down their level of load reduction. The program would have an incentive structure with tiers of payment for different levels of load reduction.

Defining minimum and maximum levels of load reduction. This plan has customers committing to a designated level of load reduction that ranges between a minimum and a maximum level. The customer is paid on a $/avoided kW basis.

A menu of payment options and incentives. These payment options and incentives include technical assistance, rebate programs/discounts on equipment purchases, revolving fund to offset the capital cost of DR-enabling technologies, and on-bill financing.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues