ECM Buyers' Guide
  

Q2 Report Suggests Short-Term Recovery for Construction Industry Not in the Cards

Latest report from FMI Corp. projects total construction in 2009 and 2010 to be down 13% and 7%

After characterizing the outlook for construction in last quarter's report as “just plain ugly,” the latest forecast from FMI, Raleigh, N.C., paints a similar picture for the second quarter. According to Heather Jones, a construction economist for FMI and author of the firm's “Second Quarter 2009 Report,” total construction in 2009 and 2010 is expected to be down 13% and 7%.

Breaking these numbers down specifically by market segment, residential construction is expected to hit rock bottom this year — with a 19% decline in 2009 and 1% in 2010. Nonresidential construction, which typically lags the general economy by about 18 months, is forecast to drop 14% this year with even further declines of 17% in 2010. Year-to-date nonresidential put-in-place construction through April is flat; however, it's expected to decrease sharply throughout the year. Tagged the only bright spot in the forecast, analysts predict nonbuilding construction will increase 4% per year in 2009 and 2010 (click here to see Chart)

According to FMI's “Second Quarter Nonresidential Construction Index (NRCI),” contractors are still reporting backlogs of nine months, which is down from 11 months in 1Q08. Jones finds that tight credit continues to cause cancellations and delays, and project delays — currently at 20% — are four times the normal rate (up from three times in 3Q08). Project cancellations are five times the normal rate and are currently at 10% of backlog (doubled from 3Q08). Based on this economic environment, credit is expected to remain tight through 2010, causing delays and cancellations to increase.

Ultimately, the key to recovering from this grim reality is upping consumer spending. However, this presents a catch-22 situation. As the report states, “Consumers won't spend while their confidence is low, and they can't spend if they don't have income from employment.” To overcome this obstacle, many hope the American Recovery and Reinvestment Act of 2009 (ARRA) will help jumpstart the struggling economy. Although this may prove true, as FMI predicted in its last quarter forecast, the bill will not single-handedly be able to save the nonresidential construction market. According to FMI's 2Q09 NRCI, relief may take longer than expected. “Now that the details of the American Recovery and Reinvestment Act of 2009 (ARRA) projects are beginning to become known, nonresidential building contractors are realizing stimulus funds won't bring an immediate cure for declining backlogs, as 88% of panelists [those surveyed for the NRCI] said they had not yet seen the effects of the stimulus bill. However, 23% expect the bill will increase their backlogs as much as 5% in the next year.”


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues